Q2:For the network of figure ,determine: a-Vc,VB, VE,Ic,VCE and IB b- Determine the net change in Ic if a change in operating condition result in Ico increasing from 0.2µA to 10 µA, VBE drops from 0.7 V to 0.5 V and B increase 25%. c-Determine the net change in Ic if a change in temperature from 25C°-85C°and Ico increasing from 0.2µA to 10 µA, VBE drops from 0.7 V to 0.5 v. 2.2 Kongb uF 510 KOhm 10 UF HH 1 kOhm B=250 10 mv 1.8Kohm
Protection System
A system that protects electrical systems from faults by isolating the problematic part from the remainder of the system, preventing power from being cut from healthy elements, improving system dependability and efficiency is the protection system. Protection devices are the equipment that are utilized to implement the protection system.
Predictive Maintenance System
Predictive maintenance technologies are designed to assist in determining the state of in-service equipment so that maintenance can be scheduled. Predictive maintenance is the application of information; proactive maintenance approaches examine the condition of equipment and anticipate when it should maintain. The purpose of predictive maintenance is to forecast when equipment will fail (depending on a variety of parameters), then prevent the failure through routine and corrective maintenance.Condition monitoring is the continual monitoring of machines during process conditions to maintain optimal machine use, which is necessary for predictive maintenance. There are three types of condition monitoring: online, periodic, and remote. Finally, remote condition monitoring allows the equipment observed from a small place and data supplied for analysis.
Preventive Maintenance System
To maintain the equipment and materials on a regular basis in order to maintain those running conditions and reduce unnecessary shutdowns due to unexpected equipment failure is called Preventive Maintenance (PM).
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 3 images