Q10: Calculate the coordinates of the traverse points for a section of a control network established prior to the construction of the new highway, data as given in the table 6 below. The coordinates of station A in the local system are defined to be Easting 1000.000 metres and Northing 2000.00 metres. The coordinates of F have been previously calculated by other surveys to be Easting 1558.27 metres and Northing 2253.93 metres. The known initial bearing from A to B is 45° 10' 10".

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

 

 

Q10: Calculate the coordinates of the traverse points for a section of a control network
established prior to the construction of the new highway, data as given in the table 6
below. The coordinates of station A in the local system are defined to be Easting
1000.000 metres and Northing 2000.00 metres. The coordinates of F have been
previously calculated by other surveys to be Easting 1558.27 metres and Northing
2253.93 metres. The known initial bearing from A to B is 45° 10' 10".
Table 6:
Station
Measured
Measured
Northing
Measured
clockwise
angle
Easting
distance to
clockwise
next station
angle
(m)
(DMS)
(Degree)
(m)
(m)
A
110.45
45°10'10"
*45.1694
1000.00
2000.00
В
121.33
185°30'30"
185.5083
C
99.86
196°10'24"
196.1733
169.27
200°10'25"
200.1736
E
135.26
160°45'45"
160.7625
F
* This is not an angle observed at A but the known initial bearing from A to B.
Transcribed Image Text:Q10: Calculate the coordinates of the traverse points for a section of a control network established prior to the construction of the new highway, data as given in the table 6 below. The coordinates of station A in the local system are defined to be Easting 1000.000 metres and Northing 2000.00 metres. The coordinates of F have been previously calculated by other surveys to be Easting 1558.27 metres and Northing 2253.93 metres. The known initial bearing from A to B is 45° 10' 10". Table 6: Station Measured Measured Northing Measured clockwise angle Easting distance to clockwise next station angle (m) (DMS) (Degree) (m) (m) A 110.45 45°10'10" *45.1694 1000.00 2000.00 В 121.33 185°30'30" 185.5083 C 99.86 196°10'24" 196.1733 169.27 200°10'25" 200.1736 E 135.26 160°45'45" 160.7625 F * This is not an angle observed at A but the known initial bearing from A to B.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 3 images

Blurred answer
Knowledge Booster
Traverse survey
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning