Q1: Draw the network for the activities in the table below by using Project Management Software MS Project software package or Primavera. All time durations are in days. No. Task Sub-task Expected Predecessor Lag Time Duration 1 Start Mobilization 4 3 Surveying 2 4 Excavation 4 3 Blinding Footings Column Necks Backfilling Grade beams 10 Slab on grade 11 End 4 6. 8 4. 7 9 8. 9 2 10 - Add task to the beginning of the project to calculate the project duration. - Make the start of the project on 1/1/2022. - Show Critical Path and Slacks (Free Float).

Computer Networking: A Top-Down Approach (7th Edition)
7th Edition
ISBN:9780133594140
Author:James Kurose, Keith Ross
Publisher:James Kurose, Keith Ross
Chapter1: Computer Networks And The Internet
Section: Chapter Questions
Problem R1RQ: What is the difference between a host and an end system? List several different types of end...
icon
Related questions
Question
Value Engineering and Project Management: Final Project
Q1: Draw the network for the activities in the table below by using Project Management Software MS
Project software package or Primavera. All time durations are in days.
No. Task
Sub-task
Expected Predecessor Lag
Time
Duration
Start
Mobilization
4
1
3
Surveying
4
Excavation
4
3
Blinding
Footings
Column Necks
Backfilling
3
4
8
5
2
2
8.
4
9
Grade beams
8
Slab on grade
End
10
2.
2.
11
10
- Add task to the beginning of the project to calculate the project duration.
- Make the start of the project on 1/1/2022.
- Show Critical Path and Slacks (Free Float).
Transcribed Image Text:Value Engineering and Project Management: Final Project Q1: Draw the network for the activities in the table below by using Project Management Software MS Project software package or Primavera. All time durations are in days. No. Task Sub-task Expected Predecessor Lag Time Duration Start Mobilization 4 1 3 Surveying 4 Excavation 4 3 Blinding Footings Column Necks Backfilling 3 4 8 5 2 2 8. 4 9 Grade beams 8 Slab on grade End 10 2. 2. 11 10 - Add task to the beginning of the project to calculate the project duration. - Make the start of the project on 1/1/2022. - Show Critical Path and Slacks (Free Float).
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Recommended textbooks for you
Computer Networking: A Top-Down Approach (7th Edi…
Computer Networking: A Top-Down Approach (7th Edi…
Computer Engineering
ISBN:
9780133594140
Author:
James Kurose, Keith Ross
Publisher:
PEARSON
Computer Organization and Design MIPS Edition, Fi…
Computer Organization and Design MIPS Edition, Fi…
Computer Engineering
ISBN:
9780124077263
Author:
David A. Patterson, John L. Hennessy
Publisher:
Elsevier Science
Network+ Guide to Networks (MindTap Course List)
Network+ Guide to Networks (MindTap Course List)
Computer Engineering
ISBN:
9781337569330
Author:
Jill West, Tamara Dean, Jean Andrews
Publisher:
Cengage Learning
Concepts of Database Management
Concepts of Database Management
Computer Engineering
ISBN:
9781337093422
Author:
Joy L. Starks, Philip J. Pratt, Mary Z. Last
Publisher:
Cengage Learning
Prelude to Programming
Prelude to Programming
Computer Engineering
ISBN:
9780133750423
Author:
VENIT, Stewart
Publisher:
Pearson Education
Sc Business Data Communications and Networking, T…
Sc Business Data Communications and Networking, T…
Computer Engineering
ISBN:
9781119368830
Author:
FITZGERALD
Publisher:
WILEY