Q1- Consider a small hydro scheme with a head of 60 m and a flow rate of 5 m³/s. If the efficiencies of the main components at rated output are penstock efficiency: 0.88 turbine efficiency: 0.78 generator efficiency: 0.95. The generator to be used is a 24 pole synchronous generator operating at 60Hz, and the reservoir supplying the scheme has a useable storage capacity of 800,000 m³. a) Calculate the normal speed and the electrical output. b) How much electrical energy can be generated without the reservoir being replenished? Ignore the effect of changes in the depth of the reservoir c) Calculate the specific speed d) which type of turbine is suitable for this hydro power scheme

Introductory Circuit Analysis (13th Edition)
13th Edition
ISBN:9780133923605
Author:Robert L. Boylestad
Publisher:Robert L. Boylestad
Chapter1: Introduction
Section: Chapter Questions
Problem 1P: Visit your local library (at school or home) and describe the extent to which it provides literature...
icon
Related questions
icon
Concept explainers
Question
Q1- Consider a small hydro scheme with a head of 60 m and a flow rate of 5 m³/s. If the efficiencies
of the main components at rated output are penstock efficiency: 0.88 turbine efficiency: 0.78
generator efficiency: 0.95. The generator to be used is a 24 pole synchronous generator operating
at 60Hz, and the reservoir supplying the scheme has a useable storage capacity of 800,000 m³.
'
a) Calculate the normal speed and the electrical output.
b) How much electrical energy can be generated without the reservoir being replenished?
Ignore the effect of changes in the depth of the reservoir
c) Calculate the specific speed
d) which type of turbine is suitable for this hydro power scheme
Transcribed Image Text:Q1- Consider a small hydro scheme with a head of 60 m and a flow rate of 5 m³/s. If the efficiencies of the main components at rated output are penstock efficiency: 0.88 turbine efficiency: 0.78 generator efficiency: 0.95. The generator to be used is a 24 pole synchronous generator operating at 60Hz, and the reservoir supplying the scheme has a useable storage capacity of 800,000 m³. ' a) Calculate the normal speed and the electrical output. b) How much electrical energy can be generated without the reservoir being replenished? Ignore the effect of changes in the depth of the reservoir c) Calculate the specific speed d) which type of turbine is suitable for this hydro power scheme
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Load flow analysis
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Introductory Circuit Analysis (13th Edition)
Introductory Circuit Analysis (13th Edition)
Electrical Engineering
ISBN:
9780133923605
Author:
Robert L. Boylestad
Publisher:
PEARSON
Delmar's Standard Textbook Of Electricity
Delmar's Standard Textbook Of Electricity
Electrical Engineering
ISBN:
9781337900348
Author:
Stephen L. Herman
Publisher:
Cengage Learning
Programmable Logic Controllers
Programmable Logic Controllers
Electrical Engineering
ISBN:
9780073373843
Author:
Frank D. Petruzella
Publisher:
McGraw-Hill Education
Fundamentals of Electric Circuits
Fundamentals of Electric Circuits
Electrical Engineering
ISBN:
9780078028229
Author:
Charles K Alexander, Matthew Sadiku
Publisher:
McGraw-Hill Education
Electric Circuits. (11th Edition)
Electric Circuits. (11th Edition)
Electrical Engineering
ISBN:
9780134746968
Author:
James W. Nilsson, Susan Riedel
Publisher:
PEARSON
Engineering Electromagnetics
Engineering Electromagnetics
Electrical Engineering
ISBN:
9780078028151
Author:
Hayt, William H. (william Hart), Jr, BUCK, John A.
Publisher:
Mcgraw-hill Education,