Q- To complement the construction of a wall or to connect a wall to be constructed with a previously constructed wall specially If the wall is to be connected vertically when It is left without completion, and each row is an apostate from the row under of it about a quarter or half a brick. The wall is left before it is completed, it is left in the place where each brick stops on the O length. It stands out by a quarter of its length from the brick on the head at the bottom, and thus the wall is saw-toothed. The previously built wall each brick is left on the head so that it will O down away from the face of the wall about quarter brick and this works done between row and row. The thickness of an existing wall is to be exceed, it will be drilled with dimensions of 1/2x2x2 bricks per square meter of the wall.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Q- To complement the construction
of a wall or to connect a wall to be
constructed with a previously
constructed wall specially If the wall
is to be connected vertically when
It is left without completion, and
each row is an apostate from the
row under of it about a quarter or
half a brick.
The wall is left before it is
completed, it is left in the place
where each brick stops on the
length. It stands out by a quarter of
its length from the brick on the
head at the bottom, and thus the
wall is saw-toothed.
The previously built wall each brick
is left on the head so that it will
down away from the face of the wall
about quarter brick and this works
done between row and row.
The thickness of an existing wall is
to be exceed, it will be drilled with
dimensions of 1/2x2x2 bricks per
square meter of the wall.
Non of them
Transcribed Image Text:Q- To complement the construction of a wall or to connect a wall to be constructed with a previously constructed wall specially If the wall is to be connected vertically when It is left without completion, and each row is an apostate from the row under of it about a quarter or half a brick. The wall is left before it is completed, it is left in the place where each brick stops on the length. It stands out by a quarter of its length from the brick on the head at the bottom, and thus the wall is saw-toothed. The previously built wall each brick is left on the head so that it will down away from the face of the wall about quarter brick and this works done between row and row. The thickness of an existing wall is to be exceed, it will be drilled with dimensions of 1/2x2x2 bricks per square meter of the wall. Non of them
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Methods of Materials Processing
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning