Proposed Capital Investment to Improve Process Yield Many engineering projects aim at improving facility utilization and process yields. This case study illustrates an engineering economy analysis related to the redesign of a major component in the manufacture of semiconductors. Semiconductor manufacturing involves taking a flat disc of silicon, called a wafer, and depositing many layers of material on top of it. Each layer has a pattern on it that, upon completion, defines the electrical circuits of the finished microprocessor. Each 8-inch wafer has up to 100 microprocessors on it. However, the typical average yield of the production line is 75% good microprocessors per wafer. At one local company, the process engineers responsible for the chemical vapor-deposition (CVD) tool (i.e., process equipment) that deposits one of the many layers have an idea for improving overall yield. They propose to improve this tool’s vacuum with a redesign of one of its major components. The engineers believe the project will result in a 2% increase in the average production yield of nondefective microprocessors per wafer. This company has only one CVD tool, and it can process 10 wafers per hour. The process engineers have determined that the CVD tool has an average utilization rate (i.e., “time running”) of 80%. A wafer costs $5,000 to manufacture, and a good microprocessor can be sold for $100. These semiconductor fabrication plants (“fabs”) operate 168 hours per week, and all good microprocessors produced can be sold. The capital investment required for the project is $250,000, and maintenance and support expenses are expected to be $25,000 per month. The lifetime of the modified tool will be five years, and the company uses a 12% MARR per year (compounded monthly) as its “hurdle rate.” Before implementing the proposed engineering solution, top management has posed the following questions to you (hired as an independent consultant) to evaluate the merits of the proposal: (a) Based on the PW method, should the project be approved? (b) If the achievable improvement in production yield has been overestimated by the process engineers, at what percent yield improvement would the project breakeven?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

A Proposed Capital Investment to Improve Process Yield

Many engineering projects aim at improving facility utilization and process yields. This case study illustrates an engineering economy analysis related to the redesign of a major component in the manufacture of semiconductors. Semiconductor manufacturing involves taking a flat disc of silicon, called a wafer, and depositing many layers of material on top of it. Each layer has a pattern on it that, upon completion, defines the electrical circuits of the finished microprocessor. Each 8-inch wafer has up to 100 microprocessors on it. However, the typical average yield of the production line is 75% good microprocessors per wafer.

At one local company, the process engineers responsible for the chemical vapor-deposition (CVD) tool (i.e., process equipment) that deposits one of the many layers have an idea for improving overall yield. They propose to improve this tool’s vacuum with a redesign of one of its major components. The engineers believe the project will result in a 2% increase in the average production yield of nondefective microprocessors per wafer.

This company has only one CVD tool, and it can process 10 wafers per hour. The process engineers have determined that the CVD tool has an average utilization rate (i.e., “time running”) of 80%. A wafer costs $5,000 to manufacture, and a good microprocessor can be sold for $100. These semiconductor fabrication plants (“fabs”) operate 168 hours per week, and all good microprocessors produced can be sold. The capital investment required for the project is $250,000, and maintenance and support expenses are expected to be $25,000 per month. The lifetime of the modified tool will be five years, and the company uses a 12% MARR per year (compounded monthly) as its “hurdle rate.”

Before implementing the proposed engineering solution, top management has posed the following questions to you (hired as an independent consultant) to evaluate the merits of the proposal:
(a) Based on the PW method, should the project be approved?
(b) If the achievable improvement in production yield has been overestimated by the process engineers, at what percent yield improvement would the project breakeven?

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Silicon
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning