Problem II. The fabricated steel members are being assembled into a truss on-site in the municipality of Alfonso, Cavite. The assembly started at the elevated ground at both sides and is to meet at the midspan. Nearing to the end of construction, it was found that the last member, CD, was fabricated too short by A mm (see the given table in MS teams). The engineer then came up with an idea of applying a force P at joints C and D as shown to close the gap. A in mm = 4.090
Problem II. The fabricated steel members are being assembled into a truss on-site in the municipality of Alfonso, Cavite. The assembly started at the elevated ground at both sides and is to meet at the midspan. Nearing to the end of construction, it was found that the last member, CD, was fabricated too short by A mm (see the given table in MS teams). The engineer then came up with an idea of applying a force P at joints C and D as shown to close the gap. A in mm = 4.090
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
I need the correct answer and as soon as possible please
![Problem II. The fabricated steel members are being assembled into a truss on-site in the municipality of Alfonso,
Cavite. The assembly started at the elevated ground at both sides and is to meet at the midspan. Nearing to the end
of construction, it was found that the last member, CD, was fabricated too short by A mm (see the given table in MS
teams). The engineer then came up with an idea of applying a force P at joints C and D as shown to close the gap.
A in mm = 4.090
P.
C'
3 m
A
B
3 m
3 m
3 m
Use E = 200 GPa and cross-sectional area of members BC, DE, CD each 4500 mm² while AC and DF being
6363.961 mm²
Determine the necessary force, P, to close the gap in kN.
b) If force P will then be removed after being assembled, calculate the force in CD in kN.
a)](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2Fbccd336c-e52a-4630-b79b-8a2017446f39%2F1f8fd8b5-9b16-49da-bb7d-b130e1dac3a2%2Fr8aghpj_processed.jpeg&w=3840&q=75)
Transcribed Image Text:Problem II. The fabricated steel members are being assembled into a truss on-site in the municipality of Alfonso,
Cavite. The assembly started at the elevated ground at both sides and is to meet at the midspan. Nearing to the end
of construction, it was found that the last member, CD, was fabricated too short by A mm (see the given table in MS
teams). The engineer then came up with an idea of applying a force P at joints C and D as shown to close the gap.
A in mm = 4.090
P.
C'
3 m
A
B
3 m
3 m
3 m
Use E = 200 GPa and cross-sectional area of members BC, DE, CD each 4500 mm² while AC and DF being
6363.961 mm²
Determine the necessary force, P, to close the gap in kN.
b) If force P will then be removed after being assembled, calculate the force in CD in kN.
a)
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning