Problem 3 Solve the scheduling data for the following project and compute the relevant information and include the information on your network (Draw the network using the activity on the node schedule technique to implement the Critical Path Method (CPM), Precedence diagramming to determine the critical path (CP) and all of the relevant information for the project). Feel free to use any of these two node designs (Use ES for the first activity = 0) Highlight the overall duration of the project with the critical path ES Activities EF Activity ES Duration LS Cr. Duration TF EF FF TF LF LS FF LF Activities' label Duration IPA A 6. B 4 A C 5 A. D A E 3 5 C, D G 6. E, F H 8. F I 9. D 8 G K 4 G, H M 5 K, L

Residential Construction Academy: House Wiring (MindTap Course List)
4th Edition
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Gregory W Fletcher
Chapter1: Residential Workplace Safety
Section: Chapter Questions
Problem 27RQ
Question
Problem 3
Solve the scheduling data for the following project and compute the relevant information and include the
information on your network (Draw the network using the activity on the node schedule technique to
implement the Critical Path Method (CPM), Precedence diagramming to determine the critical path (CP)
and all of the relevant information for the project).
Feel free to use any of these two node designs (Use ES for the first activity = 0)
Highlight the overall duration of the project with the critical path
Activity
ES
Activities
EF
ES
Duration
LS
Cr.
Duration
TE
EF
FF
TF
LF
LS
FF
LF
Activities' label
Duration
IPA
A
6
4
A
A
D
A
E
3
F
5
С. D
G
E, F
H
8
F
I
9
D
J
8
G
K
4
G, H
4
I
M
5
K, L
Transcribed Image Text:Problem 3 Solve the scheduling data for the following project and compute the relevant information and include the information on your network (Draw the network using the activity on the node schedule technique to implement the Critical Path Method (CPM), Precedence diagramming to determine the critical path (CP) and all of the relevant information for the project). Feel free to use any of these two node designs (Use ES for the first activity = 0) Highlight the overall duration of the project with the critical path Activity ES Activities EF ES Duration LS Cr. Duration TE EF FF TF LF LS FF LF Activities' label Duration IPA A 6 4 A A D A E 3 F 5 С. D G E, F H 8 F I 9 D J 8 G K 4 G, H 4 I M 5 K, L
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Types of Scheduling Techniques
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Residential Construction Academy: House Wiring (M…
Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781285852225
Author:
Gregory W Fletcher
Publisher:
Cengage Learning
Architectural Drafting and Design (MindTap Course…
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning
Engineering Fundamentals: An Introduction to Engi…
Engineering Fundamentals: An Introduction to Engi…
Civil Engineering
ISBN:
9781305084766
Author:
Saeed Moaveni
Publisher:
Cengage Learning
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning