Problem 17-1A (Algo) Comparing plantwide rate method and activity-based costing LO P1, P3 Craftmore Machining reports the following budgeted overhead cost and related data for this year. Budgeted Cost Activity Assembly Activity Cost Driver $ 497,250 Direct labor hours (DLH) 76,500 Engineering hours (EH) 25,500 Machine hours (MH) Product design Budgeted Activity Usage 13,000 1,500 10,200 510 Electricity 63,750 Setups $ 663,000 Setup Total Required: 1. Compute a single plantwide overhead rate assuming the company allocates overhead cost based on 13,000 direct labor hours. 2. Job 31 used 320 direct labor hours and Job 42 used 600 direct labor hours. Allocate overhead cost to each job using the single plantwide overhead rate from part 1. 3. Compute an activity rate for each activity using activity-based costing. 4. Allocate overhead costs to Job 31 and Job 42 using activity-based costing. Activity Cost Driver Direct labor hours (DLH) Engineering hours (EH) Machine hours (MH) Setups Activity Usage Job 31 320 37 40 5 Job 42 600 43 70 7
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
I want answer for 1,2 and 4
I need help for requirement number 1 , 2 and 4
please answer within the format by providing formula the detailed working
Please provide answer in text (Without image)
Please provide answer in text (Without image)
Please provide answer in text (Without image)