Premier Consulting's two consultants, Avery and Baker, can be scheduled to work for clients up to a maximum of 160 hours each over the next four weeks. A third consultant, Campbell, has some administrative assignments already planned and is available for clients up to a maximum of 140 hours over the next four weeks. The company has four clients with projects in process. The estimated hourly requirements for each of the clients over the four-week period are as follows. Client Hours 1 A B C D 12 3 4 Avery 180 75 Baker 100 Hourly rates vary for the consultant-client combination and are based on several factors, including project type and the consultant's experience. The rates (dollars per hour) for each consultant-client combination are as follows. 85 Consultant A B C D 100 125 115 100 120 135 115 120 1 Client 2 3 Campbell 155 150 140 130 (a) Develop a network representation of the problem. (Submit a file with a maximum size of 1 MB.) Choose File No file chosen This answer has not been graded yet. (b) Formulate the problem as a linear program, with the optimal solution providing the hours each consultant should be scheduled for each client to maximize the consulting firm's billings. (i) Let x = number of hours from consultant i assigned to client j, using the indices from the tables. For example, X₁4 is the number of hours Campbell spends with Client D.

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
Premier Consulting's two consultants, Avery and Baker, can be scheduled to work for clients up to a maximum of 160 hours each over the next four weeks. A third consultant, Campbell, has some administrative
assignments already planned and is available for clients up to a maximum of 140 hours over the next four weeks. The company has four clients with projects in process. The estimated hourly requirements for
each of the clients over the four-week period are as follows.
Client
A
B
C
D
2
3
Avery
4
Hours
Baker
180
Campbell
75
Hourly rates vary for the consultant-client combination and are based on several factors, including project type and the consultant's experience. The rates (dollars per hour) for each consultant-client combination
are as follows.
100
Consultant A
85
Client
B
100 125 115 100
120 135
с
115 120
155 150 140 130
This answer has not been graded yet.
(a) Develop a network representation of the problem. (Submit a file with a maximum size of 1 MB.)
Choose File No file chosen
(b) Formulate the problem as a linear program, with the optimal solution providing the hours each consultant should be scheduled for each client to maximize the consulting firm's billings.
(i) Let Xij
= number of hours from consultant i assigned to client j, using the indices from the tables. For example, X34 is the number of hours Campbell spends with Client D.
Transcribed Image Text:Premier Consulting's two consultants, Avery and Baker, can be scheduled to work for clients up to a maximum of 160 hours each over the next four weeks. A third consultant, Campbell, has some administrative assignments already planned and is available for clients up to a maximum of 140 hours over the next four weeks. The company has four clients with projects in process. The estimated hourly requirements for each of the clients over the four-week period are as follows. Client A B C D 2 3 Avery 4 Hours Baker 180 Campbell 75 Hourly rates vary for the consultant-client combination and are based on several factors, including project type and the consultant's experience. The rates (dollars per hour) for each consultant-client combination are as follows. 100 Consultant A 85 Client B 100 125 115 100 120 135 с 115 120 155 150 140 130 This answer has not been graded yet. (a) Develop a network representation of the problem. (Submit a file with a maximum size of 1 MB.) Choose File No file chosen (b) Formulate the problem as a linear program, with the optimal solution providing the hours each consultant should be scheduled for each client to maximize the consulting firm's billings. (i) Let Xij = number of hours from consultant i assigned to client j, using the indices from the tables. For example, X34 is the number of hours Campbell spends with Client D.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 6 images

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.