Peak-hour traffic demand between an origin and destination pair is initially 3500 veh/h. The two routes connecting the pairs have performance functions t₁ = 2+3 and t₂ = 4+222, where the times t₁ and t₂ are in minutes and the flows 1 and 2 and capacities c₁ and c₂ are in thousands of vehicles per hour. Initially, the capacities of routes 1 and 2 are 2500 and 4000 veh/h. A reconstruction project reduces capacity on route 2 to 2000 veh/hr. What is the flow x₁ (in thousands of vehicles) on route 1 before the reconstruction? 2.206 2.206 Assuming user equilibrium before and during reconstruction, which proportion of the total demand should be diverted (or removed) to ensure that travel times during reconstruction are equal to those before reconstruction? →X544 is wrong 644 10³ vehs ✔ 644 X
Peak-hour traffic demand between an origin and destination pair is initially 3500 veh/h. The two routes connecting the pairs have performance functions t₁ = 2+3 and t₂ = 4+222, where the times t₁ and t₂ are in minutes and the flows 1 and 2 and capacities c₁ and c₂ are in thousands of vehicles per hour. Initially, the capacities of routes 1 and 2 are 2500 and 4000 veh/h. A reconstruction project reduces capacity on route 2 to 2000 veh/hr. What is the flow x₁ (in thousands of vehicles) on route 1 before the reconstruction? 2.206 2.206 Assuming user equilibrium before and during reconstruction, which proportion of the total demand should be diverted (or removed) to ensure that travel times during reconstruction are equal to those before reconstruction? →X544 is wrong 644 10³ vehs ✔ 644 X
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
please give correct answer for 2nd only

Transcribed Image Text:Peak-hour traffic demand between an origin and destination pair is initially 3500 veh/h. The two routes
connecting the pairs have performance functions t₁
=
2+31 and t2
4+22, where the times t₁ and
t2 are in minutes and the flows ₁ and 2 and capacities c₁ and c₂ are in thousands of vehicles per hour.
Initially, the capacities of routes 1 and 2 are 2500 and 4000 veh/h. A reconstruction project reduces capacity
on route 2 to 2000 veh/hr.
What is the flow 1 (in thousands of vehicles) on route 1 before the reconstruction?
2.206
2.206
644
Assuming user equilibrium before and during reconstruction, which proportion of the total demand should be
diverted (or removed) to ensure that travel times during reconstruction are equal to those before
reconstruction?
644
-
10³ vehs
Submit
X
ЭХ 64цis wrong
»X544'5
C
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 5 steps

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning