Peaches are to be transported from three orchard regions to two canneries. Intermediate stops at a consolidation station are possible. Orchard Supply Station Cannery Capacity Riverside 1200 Waterford Sanderson 2500 Sunny Slope 1500 Northside Millville 3000 Old Farm 4000 Shipment costs are shown in the table below. Where no cost is given, shipments are not possible. Where costs are shown, shipments are possible in either direction. R SS OF W N S M Riverside 5 Sunny Side 4 5 Old Farm 6 3 Waterford 2 4 Northside 5 9 Sanderson Millville Solve the network model for this problem, indicating how much product should move across each route. use spreadsheet as your answer.
-
Peaches are to be transported from three orchard regions to two canneries. Intermediate stops at a consolidation station are possible.
Orchard
Supply
Station
Cannery
Capacity
Riverside
1200
Waterford
Sanderson
2500
Sunny Slope
1500
Northside
Millville
3000
Old Farm
4000
Shipment costs are shown in the table below. Where no cost is given, shipments are not possible. Where costs are shown, shipments are possible in either direction.
R
SS
OF
W
N
S
M
Riverside
5
Sunny Side
4
5
Old Farm
6
3
Waterford
2
4
Northside
5
9
Sanderson
Millville
Solve the network model for this problem, indicating how much product should move across each route. use spreadsheet as your answer.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 6 images