MJ Mining Company owns three mines and has three different types of ores that is mined. For each ore, the number of tons per day available from each mine and the minimum number of tons required to fill orders are given in the following table. ORE TYPE Iron Lead Nickel Daily Costs Mine 1 Mine 2 Y 10 30 10 20 20 0 $5,900 $7,200 Minimize Cost = subject to: X > 750 > 440 Mine 3 Let x,y, and z represent the number of days to run Mines 1, 2, and 3 respectively. Type the objective function and the left hand side of each constraint in the following answer boxes. >450 Z 10 0 15 $6,100 Required tons 750 440 450

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
Do not answer in image format
Use software to solve the linear program and enter the solution below. If there is no
solution enter 'NONE' in all boxes below.
Round days to two decimal places where necessary.
Number of days to run Mine 1 is
Number of days to run Mine 2 is
Number of days to run Mine 3 is
Minimum cost is $
Transcribed Image Text:Use software to solve the linear program and enter the solution below. If there is no solution enter 'NONE' in all boxes below. Round days to two decimal places where necessary. Number of days to run Mine 1 is Number of days to run Mine 2 is Number of days to run Mine 3 is Minimum cost is $
MJ Mining Company owns three mines and has three different types of ores that is
mined. For each ore, the number of tons per day available from each mine and the
minimum number of tons required to fill orders are given in the following table.
ORE TYPE
Iron
Lead
Nickel
Daily Costs
Mine 1
Mine 2
Y
10
30
10
20
20
0
$5,900 $7,200
Minimize Cost =
subject to:
X
Let x,y, and z represent the number of days to run Mines 1, 2, and 3 respectively.
>750
Mine 3
Z
Type the objective function and the left hand side of each constraint in the following
answer boxes.
> 440
10
0
15
$6,100
> 450
Required
tons
750
440
450
Transcribed Image Text:MJ Mining Company owns three mines and has three different types of ores that is mined. For each ore, the number of tons per day available from each mine and the minimum number of tons required to fill orders are given in the following table. ORE TYPE Iron Lead Nickel Daily Costs Mine 1 Mine 2 Y 10 30 10 20 20 0 $5,900 $7,200 Minimize Cost = subject to: X Let x,y, and z represent the number of days to run Mines 1, 2, and 3 respectively. >750 Mine 3 Z Type the objective function and the left hand side of each constraint in the following answer boxes. > 440 10 0 15 $6,100 > 450 Required tons 750 440 450
Expert Solution
steps

Step by step

Solved in 4 steps with 36 images

Blurred answer
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,