Make legs Finish furniture Asemble and ship Cut wood Make tops

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
100%
Make legs
Finish
furniture
Assemble
Cut wood
and ship
Make tops
Transcribed Image Text:Make legs Finish furniture Assemble Cut wood and ship Make tops
6. A furniture factory makes two types of wooden tables,
large and small. See the flowchart below.
Setup
Time,
Run Time Capacity,
per Piece, Pieces
per Hour
Minutes Minutes
Wood cutting
30
5
15
Make four legs
60
10
10
Make tops
60
12
Finish the wood
20
8.
12
Assemble and ship
20
17
14
Small tables are made in batches of 100, and large tables
are made in batches of 50. A batch includes a fixed
setup time for the entire batch at each process step and a
run time for each piece in the batch. Both large and
small tables have the same processing times. The capac-
ities of cach process step are given, and apply to produc-
tion of cither type of table, as shown in the flowchart.
a. What is the capacity of the system, and what is the
bottleneck?
b. What are the throughput times for batches of large
and small tables?
c. When producing at a rate of six small tables per
hour on average, how many tables will be in the
system?
Transcribed Image Text:6. A furniture factory makes two types of wooden tables, large and small. See the flowchart below. Setup Time, Run Time Capacity, per Piece, Pieces per Hour Minutes Minutes Wood cutting 30 5 15 Make four legs 60 10 10 Make tops 60 12 Finish the wood 20 8. 12 Assemble and ship 20 17 14 Small tables are made in batches of 100, and large tables are made in batches of 50. A batch includes a fixed setup time for the entire batch at each process step and a run time for each piece in the batch. Both large and small tables have the same processing times. The capac- ities of cach process step are given, and apply to produc- tion of cither type of table, as shown in the flowchart. a. What is the capacity of the system, and what is the bottleneck? b. What are the throughput times for batches of large and small tables? c. When producing at a rate of six small tables per hour on average, how many tables will be in the system?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Purchase process
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.