Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per machine-hour $6 Recently, Job T687 was completed with the following characteristics: Number of units in the job 10 Total machine-hours Direct materials Direct labor cost 31,500 40 $2,055 $2,575 $1,205 $ 220,500 $ 685 $1,370 The total job cost for Job T687 is closest to: (Round your intermediate calculations to 2 decimal places.) Multiple Choice $1,890
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
Please do not give solution in image format thanku
Trending now
This is a popular solution!
Step by step
Solved in 4 steps