Low Ball Construction Co. has determined that the heaviest load to be lifted on one of its projects weighs 22,000 lbs. From the tower crane location on the building site, the required reach for this lift will be 100 ft. The crane is equipped with an L7 jib and a four-part hoist line (Table 16.3 load chart). This critical lift is of a piece of mechanical equipment and will require a 1,000-lb spreader bar attached to a 200-lb set of slings. If assembled in the proposed configuration, can the crane safely make the pick?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
**TABLE 16.3: Lifting Capacities in Pounds for a Tower Crane (Continued)**

**Jib Model:**

| Maximum Hook Reach  | L1       | L2       | L3       | L4       | L5       | L6       | L7       | Hook Reach |
|---------------------|----------|----------|----------|----------|----------|----------|----------|------------|
|                     | 100' 9"  | 119' 9"  | 138' 9"  | 157' 9"  | 176' 9"  | 195' 9"  | 214' 9"  |            |
|                     | 55,200   | 55,200   | 55,200   | 55,200   | 55,200   | 55,200   | 55,200   | 13' 6"     |
|                     | 55,200   | 55,200   | 55,200   | 55,200   | 55,200   | 55,200   | 52,500   | 48' 9"     |
|                     | 55,200   | 55,200   | 55,200   | 55,200   | 55,200   | 51,400   |          | 51' 0"     |
|                     | 55,200   | 55,200   | 55,200   | 55,200   | 51,500   | 48,300   | 45,600   | 53' 6"     |
|                     | 55,200   | 55,200   | 55,200   | 50,700   | 47,100   | 44,600   | 42,100   | 60' 6"     |
|                     | 46,200   | 46,200   | 46,200   | 42,800   | 39,700   | 37,400   | 35,200   | 70' 0"     |
|                     | 39,400   | 39,400   | 39,400   | 36,500   | 34,100   | 31,900   |
Transcribed Image Text:**TABLE 16.3: Lifting Capacities in Pounds for a Tower Crane (Continued)** **Jib Model:** | Maximum Hook Reach | L1 | L2 | L3 | L4 | L5 | L6 | L7 | Hook Reach | |---------------------|----------|----------|----------|----------|----------|----------|----------|------------| | | 100' 9" | 119' 9" | 138' 9" | 157' 9" | 176' 9" | 195' 9" | 214' 9" | | | | 55,200 | 55,200 | 55,200 | 55,200 | 55,200 | 55,200 | 55,200 | 13' 6" | | | 55,200 | 55,200 | 55,200 | 55,200 | 55,200 | 55,200 | 52,500 | 48' 9" | | | 55,200 | 55,200 | 55,200 | 55,200 | 55,200 | 51,400 | | 51' 0" | | | 55,200 | 55,200 | 55,200 | 55,200 | 51,500 | 48,300 | 45,600 | 53' 6" | | | 55,200 | 55,200 | 55,200 | 50,700 | 47,100 | 44,600 | 42,100 | 60' 6" | | | 46,200 | 46,200 | 46,200 | 42,800 | 39,700 | 37,400 | 35,200 | 70' 0" | | | 39,400 | 39,400 | 39,400 | 36,500 | 34,100 | 31,900 |
Low Ball Construction Co. has determined that the heaviest load to be lifted on one of its projects weighs 22,000 lbs. From the tower crane location on the building site, the required reach for this lift will be 100 ft. The crane is equipped with an L7 jib and a four-part hoist line (Table 16.3 load chart). This critical lift is of a piece of mechanical equipment and will require a 1,000-lb spreader bar attached to a 200-lb set of slings. If assembled in the proposed configuration, can the crane safely make the pick?
Transcribed Image Text:Low Ball Construction Co. has determined that the heaviest load to be lifted on one of its projects weighs 22,000 lbs. From the tower crane location on the building site, the required reach for this lift will be 100 ft. The crane is equipped with an L7 jib and a four-part hoist line (Table 16.3 load chart). This critical lift is of a piece of mechanical equipment and will require a 1,000-lb spreader bar attached to a 200-lb set of slings. If assembled in the proposed configuration, can the crane safely make the pick?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Management of materials
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning