Lang Industrial Systems Company (LISC) is trying to decide between two different conveyor belt systems. System A costs $252,000, has a four-year life, and requires $78,000 in pretax annual operating costs. System B costs $354,000, has a six-year life, and requires $72,000 in pretax annual operating costs. Suppose LISC always needs a conveyor belt system; when one wears out, it must be replaced. Assume the tax rate is 34 percent and the discount rate is 8 percent. Calculate the EAC for both conveyor belt systems. (Negative amounts should be indicated by a minus sign. Do not round intermediate calculations and round your answers to 2 decimal places, e.g., 32.16.) System A System B EAC 127564.C Which conveyor belt system should the firm choose? • System B ○ System A

ENGR.ECONOMIC ANALYSIS
14th Edition
ISBN:9780190931919
Author:NEWNAN
Publisher:NEWNAN
Chapter1: Making Economics Decisions
Section: Chapter Questions
Problem 1QTC
icon
Related questions
Question
Lang Industrial Systems Company (LISC) is trying to decide between two different
conveyor belt systems. System A costs $252,000, has a four-year life, and requires
$78,000 in pretax annual operating costs. System B costs $354,000, has a six-year life,
and requires $72,000 in pretax annual operating costs. Suppose LISC always needs a
conveyor belt system; when one wears out, it must be replaced. Assume the tax rate is
34 percent and the discount rate is 8 percent.
Calculate the EAC for both conveyor belt systems. (Negative amounts should be
indicated by a minus sign. Do not round intermediate calculations and round your
answers to 2 decimal places, e.g., 32.16.)
System A
System B
EAC
127564.C
Which conveyor belt system should the firm choose?
• System B
○ System A
Transcribed Image Text:Lang Industrial Systems Company (LISC) is trying to decide between two different conveyor belt systems. System A costs $252,000, has a four-year life, and requires $78,000 in pretax annual operating costs. System B costs $354,000, has a six-year life, and requires $72,000 in pretax annual operating costs. Suppose LISC always needs a conveyor belt system; when one wears out, it must be replaced. Assume the tax rate is 34 percent and the discount rate is 8 percent. Calculate the EAC for both conveyor belt systems. (Negative amounts should be indicated by a minus sign. Do not round intermediate calculations and round your answers to 2 decimal places, e.g., 32.16.) System A System B EAC 127564.C Which conveyor belt system should the firm choose? • System B ○ System A
Expert Solution
steps

Step by step

Solved in 6 steps

Blurred answer
Knowledge Booster
Costs
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, economics and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
ENGR.ECONOMIC ANALYSIS
ENGR.ECONOMIC ANALYSIS
Economics
ISBN:
9780190931919
Author:
NEWNAN
Publisher:
Oxford University Press
Principles of Economics (12th Edition)
Principles of Economics (12th Edition)
Economics
ISBN:
9780134078779
Author:
Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:
PEARSON
Engineering Economy (17th Edition)
Engineering Economy (17th Edition)
Economics
ISBN:
9780134870069
Author:
William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:
PEARSON
Principles of Economics (MindTap Course List)
Principles of Economics (MindTap Course List)
Economics
ISBN:
9781305585126
Author:
N. Gregory Mankiw
Publisher:
Cengage Learning
Managerial Economics: A Problem Solving Approach
Managerial Economics: A Problem Solving Approach
Economics
ISBN:
9781337106665
Author:
Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:
Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-…
Managerial Economics & Business Strategy (Mcgraw-…
Economics
ISBN:
9781259290619
Author:
Michael Baye, Jeff Prince
Publisher:
McGraw-Hill Education