Joey is opening a coffee shop and he needs to decide how many baristas he should staff.He did some analysis of other coffee shops and he determined that this is anM/M/s system. He expects customers to arrive at the rate of 6 per minute and the service ratewill be 3 customers per minute per barista. He estimates the cost of waiting Cw to be e60 and the cost of service Cs will be e14 per hour per barista. (a) What is the minimum number of servers this system must have? (b) What number of servers will minimise the total cost
Optimization
Optimization comes from the same root as "optimal". "Optimal" means the highest. When you do the optimization process, that is when you are "making it best" to maximize everything and to achieve optimal results, a set of parameters is the base for the selection of the best element for a given system.
Integration
Integration means to sum the things. In mathematics, it is the branch of Calculus which is used to find the area under the curve. The operation subtraction is the inverse of addition, division is the inverse of multiplication. In the same way, integration and differentiation are inverse operators. Differential equations give a relation between a function and its derivative.
Application of Integration
In mathematics, the process of integration is used to compute complex area related problems. With the application of integration, solving area related problems, whether they are a curve, or a curve between lines, can be done easily.
Volume
In mathematics, we describe the term volume as a quantity that can express the total space that an object occupies at any point in time. Usually, volumes can only be calculated for 3-dimensional objects. By 3-dimensional or 3D objects, we mean objects that have length, breadth, and height (or depth).
Area
Area refers to the amount of space a figure encloses and the number of square units that cover a shape. It is two-dimensional and is measured in square units.
Joey is opening a coffee shop and he needs to decide how many baristas he should staff.He did some analysis of other coffee shops and he determined that this is anM/M/s system. He expects customers to arrive at the rate of 6 per minute and the service ratewill be 3 customers per minute per barista. He estimates the cost of waiting Cw to be e60 and the cost of service Cs will be e14 per hour per barista.
(a) What is the minimum number of servers this system must have?
(b) What number of servers will minimise the total cost