Jesaki Furniture Company has two plants tha tables and chairs. In 1 day of operation, plant

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question

Question is attached to the screenshot thanks!@@#@#

 

Jesaki Furniture Company has two plants that produce lumber used in manufacturing
tables and chairs. In 1 day of operation, plant A can produce the lumber required to
manufacture 22 tables and 61 chairs, while plant B can produce the lumber required
to manufacture 28 tables and 51 chairs. In this production run, the company needs
enough lumber to manufacture at least 440 tables and 830 chairs.
Options
It costs $875 per day to operate plant A and $850 per day to operate plant B. The
company needs to produce sufficient lumber at a minimum cost.
This can be set up as a linear programming problem where you minimize the
operational cost C. Introduce the decision variables:
Shipping Tool will be moving to a new
improved features and snip like usual with Snip
(or try the shortcut
logo key Shift
x = number of days to use plant A
y = number of days to use plant B
Find the objective function C. Snip & Sketch
OC = 22x + 28y
C = 875x + 850y
OC = 850x + 875y
OC = 61x + 51y
OC = 440x + 830y
%3D
Transcribed Image Text:Jesaki Furniture Company has two plants that produce lumber used in manufacturing tables and chairs. In 1 day of operation, plant A can produce the lumber required to manufacture 22 tables and 61 chairs, while plant B can produce the lumber required to manufacture 28 tables and 51 chairs. In this production run, the company needs enough lumber to manufacture at least 440 tables and 830 chairs. Options It costs $875 per day to operate plant A and $850 per day to operate plant B. The company needs to produce sufficient lumber at a minimum cost. This can be set up as a linear programming problem where you minimize the operational cost C. Introduce the decision variables: Shipping Tool will be moving to a new improved features and snip like usual with Snip (or try the shortcut logo key Shift x = number of days to use plant A y = number of days to use plant B Find the objective function C. Snip & Sketch OC = 22x + 28y C = 875x + 850y OC = 850x + 875y OC = 61x + 51y OC = 440x + 830y %3D
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,