PROPAGATION OF ERROR You are tasked to supervise the design of 0.5MW wind turbine to be constructed in a Wind Farm in Pililla, Rizal. Suppose the design criteria are as follows: The air density as surveyed after 2 year period averaged at 1.225 kg / cubic meter. The sweeping diameter of the rotor blades is 125m, and the anemometer reading in the area amounts to 4.2m/s on a 2 year period of survey. What is the theoretical power output of the turbine assuming 100% efficiency of operation? Your answer must be in kW and in two decimal places with correct signs. In the previous problem, if the diameter measurement is off by 0.1m and the anemometer reading is also fluctuating by 0.05m/s and if the error measurement for theoretical power output must be limited to 3%, WHY OR WHY NOT should you accept the design? * Show complete solution in paper.
PROPAGATION OF ERROR
You are tasked to supervise the design of 0.5MW wind turbine to be constructed in a Wind Farm in Pililla, Rizal. Suppose the design criteria are as follows: The air density as surveyed after 2 year period averaged at 1.225 kg / cubic meter. The sweeping diameter of the rotor blades is 125m, and the anemometer reading in the area amounts to 4.2m/s on a 2 year period of survey. What is the theoretical power output of the turbine assuming 100% efficiency of operation? Your answer must be in kW and in two decimal places with correct signs.
In the previous problem, if the diameter measurement is off by 0.1m and the anemometer reading is also fluctuating by 0.05m/s and if the error measurement for theoretical power output must be limited to 3%, WHY OR WHY NOT should you accept the design? *
Show complete solution in paper.

Step by step
Solved in 3 steps with 3 images

In the 3% error, why is the design acceptable?