In each of the following, name the term defined or answer the question. Answers are listed at the bottom. This means producing only what is needed when needed and no more.  A period of time during which the production schedule cannot be changed. Producing a mix of products that matches demand as closely as possible. A production control system that uses a signaling device to regulate the flow of material.  If the lead time for an item is exactly five days, the demand is a constant four units per day, and the shipment container contains two units, how many kanban card sets would be needed? (Assume 0 percent safety stock.) A firm wants to justify smaller lot sizes economically. Management knows that it cannot change the cost to carry one unit in inventory because this is largely based on the value of the item. To justify asmaller lot size, what must it do?

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter11: Simulation Models
Section: Chapter Questions
Problem 47P
icon
Related questions
Question

In each of the following, name the term defined or answer the question. Answers are listed at the bottom.

  1. This means producing only what is needed when needed and no more.
  2.  A period of time during which the production schedule cannot be changed.
  3. Producing a mix of products that matches demand as closely as possible.
  4. A production control system that uses a signaling device to regulate the flow of material.
  5.  If the lead time for an item is exactly five days, the demand is a constant four units per day, and the shipment container contains two units, how many kanban card sets would be needed? (Assume 0 percent safety stock.)
  6. A firm wants to justify smaller lot sizes economically. Management knows that it cannot change the cost to carry one unit in inventory because this is largely based on the value of the item. To justify a
    smaller lot size, what must it do?
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Lean supply chain
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,