In Agile: O All code should be written before test plans are created in case changes in the code occur Test plans should be written before coding begins All coding should be stopped at a time in the sprint that allows adequate time to write test plans and perform the testing Testing is not a part of the sprint DAD stands for: Direct Agile Discipline Disciplined Agile Delivery Direct Agile Delivery Detailed Agile Delivery
Theory and Design for Mechanical Measurements
Measurement is a term that refers to analyzing a manufactured component regarding the degree of accuracy for dimensions, tolerances, geometric profile, roundness, flatness, smoothness, etc. Measurement always involves comparing the manufactured component or the prototype with a standard specimen whose dimensions and other parameters are assumed to be perfect and do not undergo changes with respect to time.Precisely in mechanical engineering the branch that deals with the application of scientific principles for measurements is known as metrology. The domain of metrology in general deals with various measurements like mechanical, chemical, thermodynamic, physical, and biological measurements. In mechanical engineering, the measurements are limited to mechanical specific such as length, mass, surface profile, flatness, roundness, viscosity, heat transfer, etc.
Basic principles of engineering metrology
Metrology is described as the science of measurement, precision, and accuracy. In other words, it is a method of measurement based on units and predefined standards.
Step by step
Solved in 2 steps