In a batch operating system, four jobs JOB1, JOB2, JOB3, JOB4 are submitted for execution. Each job involves an I/O activity, followed by a CPU time, followed by another I/O activity of the same time span as the first. Each job is associated with a different I/O device. JOB1 requires a total of 11 ms, with 1 ms CPU time. JOB2 requires 10 ms total time with 2 ms CPU time. JOB3 requires 56 ms total time with 8 ms CPU time. JOB4 requires 19 ms total time with 5 ms CPU time. Assume a multiprogramming system and answer the following: 1.What will be the total time to complete all jobs? 2. What will be the CPU utilisation? 3. What will be the turnaround time of JOB4? 4 .What will be the average turnaround time?
In a batch
Assume a multiprogramming system and answer the following:
1.What will be the total time to complete all jobs?
2. What will be the CPU utilisation?
3. What will be the turnaround time of JOB4?
4 .What will be the average turnaround time?