Ian and Ada are both training for a marathon. Ian's house is located 20 km north of Ada's house. At 9:00 a.m. one Saturday, Ian leaves his house and jogs south at 8 km/h. At the same time, Ada leaves her house and jogs east at 6 km/h. When are Ian and Ada closest together, given that they both run for 2.5 h? 10:00 am 10:36 am 12:00 pm none of the above

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
These are two sub parts not 2 question please solve both
Ian and Ada are both training for a marathon. Ian's house is located 20 km north
of Ada's house. At 9:00 a.m. one Saturday, Ian leaves his house and jogs south at
8 km/h. At the same time, Ada leaves her house and jogs east at 6 km/h. When
are lan and Ada closest together, given that they both run for 2.5 h?
10:00 am
10:36 am
12:00 pm
none of the above
Transcribed Image Text:Ian and Ada are both training for a marathon. Ian's house is located 20 km north of Ada's house. At 9:00 a.m. one Saturday, Ian leaves his house and jogs south at 8 km/h. At the same time, Ada leaves her house and jogs east at 6 km/h. When are lan and Ada closest together, given that they both run for 2.5 h? 10:00 am 10:36 am 12:00 pm none of the above
A woman wants to construct a box whose base length is twice the base width. The material to build the
top and bottom is $9/m² and the material to build the sides is $6/m². If the woman wants the box to have
a volume of 70 m³, determine the dimensions of the box (in metres) that will minimize the cost of
production. What is the minimum cost?
$328.02
$528.02
$728.02
none of the above
Transcribed Image Text:A woman wants to construct a box whose base length is twice the base width. The material to build the top and bottom is $9/m² and the material to build the sides is $6/m². If the woman wants the box to have a volume of 70 m³, determine the dimensions of the box (in metres) that will minimize the cost of production. What is the minimum cost? $328.02 $528.02 $728.02 none of the above
Expert Solution
steps

Step by step

Solved in 4 steps with 4 images

Blurred answer
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,