(i) Your tirm is constructing a bridge and you are planning to import material from a quarry with a swell factor of 12 percent and the quarry is located at a distance = Your Roll number/50 kilometers from your bridge site. The amount paid to the quarry owner is at unit price is Rs 2.5 per cubic- meter, You are hauling material by 25 ton trucks which can run at a speed of 30 kilometer hour and the truck can offload its load in five minutes. You are using a bulldozer at the quarry to pile the material for top-loading into trucks by a front- end loader, The bulldozer can pile-up enough material needed for transport. Your firm have a front-end loader with a loading rate of 30 cubic-meter per hour as bank-measure. The front-end loader and trucks are leased at a rate of Re4500lday and Rs3000day for eight hours/day. Please use the salary of the workers, operators, drivers and other professional staff according to your own choice Please calculate the Amount and duration of transporting a quantity of fifty thousand cubic yardis of gravel from this quarry to your bridge site.

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter10: Pricing Excavation And Backfill
Section: Chapter Questions
Problem 7RQ
icon
Related questions
icon
Concept explainers
Question
100%
roll number= 791
(ii) Your lirnm is constructing a bridge and you are planning to import material from a quarry with a
swell factor of 12 percent and the quarry is located at a distance = Your Roll number/50 kilometers
from your bridge site. The amount paid to the quarry owner is at unit price is Rs 2.5 per cubic-
meter, You are hauling material by 25 ton trucks which can run at a speed of 30 kilometer hour
and the truck can offload its load in five minutes.
You are using a bulldozer at the quarry to pile the material for top-loading into trucks by a front-
end loader, The bulldozer can pile-up enough material needed for transport. Your firm have a
front-end londer with a loading rate of 30 cubio-meter per hour as bank-measure. The front-end
loader and trucks are leased at a rate of Re4500lday and Rs3000day for eight hours/day.
Please use the salary of the workers, operators, drivers and other professional staff according to
your own choice
Please calculate the Amount and duration of transporting a quantity
of fifty thousand eutie yards of gravel from this quarry to your bridge site,
Transcribed Image Text:(ii) Your lirnm is constructing a bridge and you are planning to import material from a quarry with a swell factor of 12 percent and the quarry is located at a distance = Your Roll number/50 kilometers from your bridge site. The amount paid to the quarry owner is at unit price is Rs 2.5 per cubic- meter, You are hauling material by 25 ton trucks which can run at a speed of 30 kilometer hour and the truck can offload its load in five minutes. You are using a bulldozer at the quarry to pile the material for top-loading into trucks by a front- end loader, The bulldozer can pile-up enough material needed for transport. Your firm have a front-end londer with a loading rate of 30 cubio-meter per hour as bank-measure. The front-end loader and trucks are leased at a rate of Re4500lday and Rs3000day for eight hours/day. Please use the salary of the workers, operators, drivers and other professional staff according to your own choice Please calculate the Amount and duration of transporting a quantity of fifty thousand eutie yards of gravel from this quarry to your bridge site,
Expert Solution
steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Electronic spreadsheet
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,