How to solved below problem based on software engineer knowledge? See the explanation of the planning case as below, when should this project start? Identify the Critical Path of planning this project. Is it possible to reduce the number of people dedicated to the project? "Software developers have identified the work breakdown structure (WBS) as shown in the table. The company applies the Modified Water Fall approach at WBS Level 1 (x.) and Level 2 (x.x), while the iteration approach at a lower level is planned to be handed over to the customer on 17 August 2023. Note that the effective time for one day is 8 (eight) hours, and working days in a week are 5 (five) days. Specifically to support this project, there are 2 Business Analysts (part timer), 2 Senior Programmers (full timer), 4 Junior Programmers (full timer), and two Testers (full timer)". Please add other assumptions if necessary. No. Work Breakdown Structure Estimated man hour 1. Requirements Definition 2 1.1. Game Requirement 3 1.1.1. Character Definition 10 1.1.2. Instrument Design 15 1.2 Software Requirement 4 1.2.1 Platform 6 1.2.2 System Description 14 2. Design Specifications 4 2.1 Software Design 6 2.1.1 Screen Design 8 2.1.2 Use Case Design 4 2.2 Hardware Design 4 2.2.1 Speaker Design 4 2.2.2 Case Design 5 3. Program Modules 4 3.1 Code Requirements 4 3.1.1 Module #1 Design 8 3.1.2 Module #1 Development (incl. Unit Test) 24 3.1.3 Module #2 Design 16 3.1.4 Module #2 Development (incl. Unit Test) 40 3.2 Testing Requirement 12 3.2.1 Sub-system Test 24 3.2.2 System Test 30
How to solved below problem based on software engineer knowledge?
See the explanation of the planning case as below, when should this project start? Identify the Critical Path of planning this project. Is it possible to reduce the number of people dedicated to the project?
"Software developers have identified the work breakdown structure (WBS) as shown in the table. The company applies the Modified Water Fall approach at WBS Level 1 (x.) and Level 2 (x.x), while the iteration approach at a lower level is planned to be handed over to the customer on 17 August 2023. Note that the effective time for one day is 8 (eight) hours, and working days in a week are 5 (five) days. Specifically to support this project, there are 2 Business Analysts (part timer), 2 Senior Programmers (full timer), 4 Junior Programmers (full timer), and two Testers (full timer)". Please add other assumptions if necessary.
No. |
Work Breakdown Structure |
Estimated man hour |
1. |
Requirements Definition |
2 |
1.1. |
Game Requirement |
3 |
1.1.1. |
Character Definition |
10 |
1.1.2. |
Instrument Design |
15 |
1.2 |
Software Requirement |
4 |
1.2.1 |
Platform |
6 |
1.2.2 |
System Description |
14 |
2. |
Design Specifications |
4 |
2.1 |
Software Design |
6 |
2.1.1 |
Screen Design |
8 |
2.1.2 |
Use Case Design |
4 |
2.2 |
Hardware Design |
4 |
2.2.1 |
Speaker Design |
4 |
2.2.2 |
Case Design |
5 |
3. |
Program Modules |
4 |
3.1 |
Code Requirements |
4 |
3.1.1 |
Module #1 Design |
8 |
3.1.2 |
Module #1 Development (incl. Unit Test) |
24 |
3.1.3 |
Module #2 Design |
16 |
3.1.4 |
Module #2 Development (incl. Unit Test) |
40 |
3.2 |
Testing Requirement |
12 |
3.2.1 |
Sub-system Test |
24 |
3.2.2 |
System Test |
30 |