has infinitely many solutions, and give two of them. 34. PRODUCTION SCHEDULING A company manufactures two products, A and B, on two machines, I and II. It has been determined that the company will realize a profit of $3/unit on Product A and a profit of $4/unit on Product B. To manufacture 1 unit of Product A requires 6 min on Machine I and 5 min on Machine II. To manufacture 1 unit of Product B requires 9 min on Machine I and 4 min on Machine II. There are 5 hr of machine time available 244 CHAPTER 4 LINEAR PROGRAMMING: AN ALGEBRAIC APPROACH 39. PR on Machine I and 3 hr of machine time available on Machine II in each work shift. How many units of each tu E product should be produced in each shift to maximize the company's profit? What is the largest profit the company can realize? Is there any time left unused on the machines? 35. PRODUCTION SCHEDULING National Business Machines Corporation manufactures two models of portable print- ers: model A and model B. Each model A costs $100 to make, and each model B costs $150. The profits are $30 for each model A and $40 for each model B por- table printer. If the total number of portable printers demanded each month does not exceed 2500 and the 40
A company manufactures two, A and B, on two machines, 1 and 2. It has been determined that the company will realize a profit of $3/unit on Product A and a profit of $4/unit on product B. To manufacture 1 unit of Product A requires 6 min on Machine 1 and 5 min on Machine 2. To manufacture 1 unit product of Product B requires 9 min on Machine 1 and 4 min on Machine 2. There are 5 hr of machine time available on Machine 1 and 3 hr of machine time available on Machine 2 in each work shift.
How many units of each product should be produced in each shift to maximize the company's profit?
What is the largest profit the company can realize?
Is there any time left unused on machines?
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 4 images