Gordon Corporation produced 10,000 digital watchnes In the current year. Variable costs are $8 per watch. Overhead wged is $2.25 pen wih.Ags e $9.50 each. Gordon's production manager reports the Incremental overhead Is $1.25 per vNatch. Gordon should Multiple Cholce Buy the watches as they would save $0.75 per watch. Continue making the watches as an additional $0.25 per watch would be incurred If bought from the supplier. Buy the watches as they would save $1.50 per watch. Buy the watches as they would save $1.75 per watch. Continue making the watches as an additional $1.50 per watch would be incurred if bought from the supplier.
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps