GIven: Desgn a Single lane ntorchange ramp to connect two higways that intersect at nght anges. One of the hghways is a new hghway that will be constracted our on enstag hignway, The new higug will run eant - west and conting highway wll vun north - sorth. "Beth hghways ast leuel graded. • The cast -west highway ll consist of a bndge nth girder thdkness of 6t · AASHTO desivable cleavance heght is to ke conudertd • Honzontal curve Super elevation of 121. should be used • Design speed should be 40 mi Inr starts at station 49 +60 Required: a) Determine length of the interchange romp b) MinIMum Ms for honzantal curue sight diıstance O length of vertical curves d) find stations PUC, PUT, PC, and PT. Eant-west PC PT

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter14: Highway Surveys And Location
Section: Chapter Questions
Problem 17P: The following table shows the stations and ordinates for a mass diagram. The free-haul distance is...
icon
Related questions
Question
Given: Desgn a single lane nterchange ramp to connect two highways
that intersect at nght andes. One of the highways is a new hghwag
that will be constructed ouer on ensting hignway, The new highewag
will run eant - west and ecetng highway wil vun north - sorth.
"Both hghways axt level graded.
* The cast -west highway will consist of a bndge with girder thckness of 6et
· AASHTO desirable cleavance height is to le conudertd
• Hovizontal curve starts at station 44+60
Super elevation
• Design speed should be 40 mi Inr
of 121. should loe used
Required: a) Determine length of the interchange romp
b) Minimun Ms for honzantal curue sight distamce
) length of vertical curves
d) find stations pVC, PUT, PC, and PT.
Eant-west
PC
PT
Transcribed Image Text:Given: Desgn a single lane nterchange ramp to connect two highways that intersect at nght andes. One of the highways is a new hghwag that will be constructed ouer on ensting hignway, The new highewag will run eant - west and ecetng highway wil vun north - sorth. "Both hghways axt level graded. * The cast -west highway will consist of a bndge with girder thckness of 6et · AASHTO desirable cleavance height is to le conudertd • Hovizontal curve starts at station 44+60 Super elevation • Design speed should be 40 mi Inr of 121. should loe used Required: a) Determine length of the interchange romp b) Minimun Ms for honzantal curue sight distamce ) length of vertical curves d) find stations pVC, PUT, PC, and PT. Eant-west PC PT
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Introduction to engineering design
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning