GIVEN D9N Dozer (Fig. 7.14) Move 2000 LCY Distance - 400 ft. (Fig. 7.14) Grade – 1% uphill (Table 7.2) Material - Loose stockpile (Table 7.2) • Operator Skills – Excellent (Table 7.2) Actual Time Working - 50 min/hr (Efficiency) • Operator Technique - slot dozing (Table 7.2) Visibility – N/A (Table 7.2) Material Weight- 2100 lb/CY (standard weight is 2300. Divide 2300 by material weight to get the factor) Transmission – Direct drive (Table 7.2) Dozer Blade - Straight blade D9N Book Efficiency (Fig. 7.14) X above factors Actual Efficiency Factors: grade x material weight x operator x type material x operator technique x visibility x efficiency x transmission x type blade
GIVEN D9N Dozer (Fig. 7.14) Move 2000 LCY Distance - 400 ft. (Fig. 7.14) Grade – 1% uphill (Table 7.2) Material - Loose stockpile (Table 7.2) • Operator Skills – Excellent (Table 7.2) Actual Time Working - 50 min/hr (Efficiency) • Operator Technique - slot dozing (Table 7.2) Visibility – N/A (Table 7.2) Material Weight- 2100 lb/CY (standard weight is 2300. Divide 2300 by material weight to get the factor) Transmission – Direct drive (Table 7.2) Dozer Blade - Straight blade D9N Book Efficiency (Fig. 7.14) X above factors Actual Efficiency Factors: grade x material weight x operator x type material x operator technique x visibility x efficiency x transmission x type blade
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Concept explainers
Question
![Chapter 7
DOZER PRODUCTION EFFICIENCY
GIVEN
D9N Dozer (Fig. 7.14)
Move 2000 LCY
Distance - 400 ft. (Fig. 7.14)
Grade – 1% uphill (Table 7.2)
Material – Loose stockpile (Table 7.2)
• Operator Skills - Excellent (Table 7.2)
Actual Time Working - 50 min/hr (Efficiency)
Operator Technique - slot dozing (Table 7.2)
Visibility – N/A (Table 7.2)
Material Weight- 2100 lb/CY (standard weight is 2300. Divide 2300 by material
weight to get the factor)
Transmission - Direct drive (Table 7.2)
Dozer Blade - Straight blade
D9N Book Efficiency (Fig. 7.14) X above factors = Actual Efficiency
Factors: grade x material weight x operator x type material x operator technique x
visibility x efficiency x transmission x type blade
Efficiency x Factors = ActuaI Efficiency =
LCY/HR.](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F01c298ef-cb75-4403-b7a0-b52192ebb929%2Fadcf6ec6-464a-4033-b265-873e76359539%2Fgjtzi7u_processed.jpeg&w=3840&q=75)
Transcribed Image Text:Chapter 7
DOZER PRODUCTION EFFICIENCY
GIVEN
D9N Dozer (Fig. 7.14)
Move 2000 LCY
Distance - 400 ft. (Fig. 7.14)
Grade – 1% uphill (Table 7.2)
Material – Loose stockpile (Table 7.2)
• Operator Skills - Excellent (Table 7.2)
Actual Time Working - 50 min/hr (Efficiency)
Operator Technique - slot dozing (Table 7.2)
Visibility – N/A (Table 7.2)
Material Weight- 2100 lb/CY (standard weight is 2300. Divide 2300 by material
weight to get the factor)
Transmission - Direct drive (Table 7.2)
Dozer Blade - Straight blade
D9N Book Efficiency (Fig. 7.14) X above factors = Actual Efficiency
Factors: grade x material weight x operator x type material x operator technique x
visibility x efficiency x transmission x type blade
Efficiency x Factors = ActuaI Efficiency =
LCY/HR.
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 4 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning