G and P Manufacturing would like to minimize the labor cost of producing dishwasher motors for a major appliance manufacturer. Although two models of motors exist, the finished models are indistinguishable from one another; their cost difference is due to a different production sequence. The time in hours required for each model in each production area is tabled here, along with the labor cost. Area A Area B Area C Cost 15 4 4 80 Model 1 3 10 8 65 Model 2 Currently labor assignments provide for 10,000 hours in each of Areas A and B and 18000 hours in Area C. If 2000 hours are available to be transferred from area B to Area A, 3000 hours are available to be transferred from area C to either Areas A or B, develop the linear programming model whose solution would tell G&P how many of each model to produce and how to allocate the workforce.

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question

A1

G and P Manufacturing would like to minimize the labor cost of producing dishwasher motors for a major
appliance manufacturer. Although two models of motors exist, the finished models are indistinguishable
from one another; their cost difference is due to a different production sequence. The time in hours
required for each model in each production area is tabled here, along with the labor cost.
Area A
Area B
Area C
Cost
Model 1
15
4
4
80
3
10
8
65
Model 2
Currently labor assignments provide for 10,000 hours in each of Areas A and B and 18000 hours in Area C.
If 2000 hours are available to be transferred from area B to Area A, 3000 hours are available to be
transferred from area C to either Areas A or B, develop the linear programming model whose solution
would tell G&P how many of each model to produce and how to allocate the workforce.
Transcribed Image Text:G and P Manufacturing would like to minimize the labor cost of producing dishwasher motors for a major appliance manufacturer. Although two models of motors exist, the finished models are indistinguishable from one another; their cost difference is due to a different production sequence. The time in hours required for each model in each production area is tabled here, along with the labor cost. Area A Area B Area C Cost Model 1 15 4 4 80 3 10 8 65 Model 2 Currently labor assignments provide for 10,000 hours in each of Areas A and B and 18000 hours in Area C. If 2000 hours are available to be transferred from area B to Area A, 3000 hours are available to be transferred from area C to either Areas A or B, develop the linear programming model whose solution would tell G&P how many of each model to produce and how to allocate the workforce.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,