From the given technical description of a lot, answer the following questions by completing the tabulation below. Determine the total area of the lot in hectares. COMPUTED LATITUDE COMPUTED DEPARTURE LINE DISTANCE (m) BEARING N 647 25 $ 53.08 E 388 80 202 03 АВ 517.46 BC 203. 03 5568- F 2009

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

SHOW COMPLETE SOLUTION.

From the given technical description of a lot, answer the following
questions by completing the tabulation below. Determine the total area of
the lot in hectares.
COMPUTED LATITUDE
COMPUTED DEPARTURE
LINE
DISTANCE (m)
BEARING
N
W
647.25
203.03
720.35
610 24
275.13
$ 53.08-E
S5.68- E
N 15.53-E
N 75.41 W
S 26.16- W
388.80
202.03
517.46
20.09
192 87
AB
BC
CD
DE
EA
SUMS
694.05
COMPASS METHOD
ADJUSTED
LATITUDE DEPARTURE LATITUDE DEPARTURE
4.89
ADJUSTED ADJUSTED
LINE
CORRECTION
ADJUSTED
LENGTH
BEARING
2.63
0.83
293
391.43
-202.86
691.12
512.57
18.56
187.42
644.91
203.71
716.08
S 52.63-E
S5.23-E
N 15.17-E
АВ
BC
CD
DE
EA
SUMS
1.53
5.45
TRANSIT METHOD
CORRECTION
LATITUDE DEPARTURE LATITUDE DEPARTURE
ADJUSTED
LENGTH
ADJUSTED
BEARING
LINE
ADJUSTED ADJUSTED
АВ
BC
CD
DE
EA
SUMS
4.12
0.91
1.46
2.48
7.60
1.56
689 93
152.81
-248.41
190.39
598.16
-122.86
715.72
617.37
277.13
N 15.43- E
N 75.67- W
S 26.32- W
ADJUSTED
LATITUDE
-391.43
-202.86
691.12
ADJUSTED
DEPARTURE
512.57
18.56
187.42
COURSE
DMD
2A
DPD
2A
512.57
1043.70
1249.68
-200,635.2751
-211,724.9820
863,678.8416
-391.43
-985.72
497.46
-200,635.2751
-18,294.9632
-93,233.9532
АВ
BC
CD
DE
EA
SUMS
Transcribed Image Text:From the given technical description of a lot, answer the following questions by completing the tabulation below. Determine the total area of the lot in hectares. COMPUTED LATITUDE COMPUTED DEPARTURE LINE DISTANCE (m) BEARING N W 647.25 203.03 720.35 610 24 275.13 $ 53.08-E S5.68- E N 15.53-E N 75.41 W S 26.16- W 388.80 202.03 517.46 20.09 192 87 AB BC CD DE EA SUMS 694.05 COMPASS METHOD ADJUSTED LATITUDE DEPARTURE LATITUDE DEPARTURE 4.89 ADJUSTED ADJUSTED LINE CORRECTION ADJUSTED LENGTH BEARING 2.63 0.83 293 391.43 -202.86 691.12 512.57 18.56 187.42 644.91 203.71 716.08 S 52.63-E S5.23-E N 15.17-E АВ BC CD DE EA SUMS 1.53 5.45 TRANSIT METHOD CORRECTION LATITUDE DEPARTURE LATITUDE DEPARTURE ADJUSTED LENGTH ADJUSTED BEARING LINE ADJUSTED ADJUSTED АВ BC CD DE EA SUMS 4.12 0.91 1.46 2.48 7.60 1.56 689 93 152.81 -248.41 190.39 598.16 -122.86 715.72 617.37 277.13 N 15.43- E N 75.67- W S 26.32- W ADJUSTED LATITUDE -391.43 -202.86 691.12 ADJUSTED DEPARTURE 512.57 18.56 187.42 COURSE DMD 2A DPD 2A 512.57 1043.70 1249.68 -200,635.2751 -211,724.9820 863,678.8416 -391.43 -985.72 497.46 -200,635.2751 -18,294.9632 -93,233.9532 АВ BC CD DE EA SUMS
Expert Solution
steps

Step by step

Solved in 7 steps with 12 images

Blurred answer
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning