Fountain Water Products (FWP) manufacturers water bottles. They have historically used a traditional system that allocated the manufacturing overhead costs based on machine hours. FWP is looking at switching to an ABC system in order to ensure more accurate product costing. They first want to compare the traditional and ABC costing systems to determine if it is worth the effort and costs to implement and maintain. They estimate a total overhead cost of $459,000. Under the traditional system they identified machine hours as the cost driver, and estimated a total of 51,000 machine hours. They actually incurred 48,700 machine hours in production. The total applied MOH calculated under the more precise ABC system was $320,000. The ABC costing system will cost $50,000 to implement. FWP has determined that a benefit of more accurate costing by $80,000 is worth the $50,000 implementation cost. What is the difference between the ABC costing and traditional system? Enter your number as a positive number. Round to the nearest whole dollar. Do not use the "$" sign.
Fountain Water Products (FWP) manufacturers water bottles. They have historically used a traditional system that allocated the
They estimate a total overhead cost of $459,000. Under the traditional system they identified machine hours as the cost driver, and estimated a total of 51,000 machine hours. They actually incurred 48,700 machine hours in production. The total applied MOH calculated under the more precise ABC system was $320,000. The ABC costing system will cost $50,000 to implement. FWP has determined that a benefit of more accurate costing by $80,000 is worth the $50,000 implementation cost. What is the difference between the ABC costing and traditional system? Enter your number as a positive number. Round to the nearest whole dollar. Do not use the "$" sign.
incorrect answer: 139,000
To calculate the difference between the ABC costing and the traditional system, you need to compare the applied manufacturing overhead costs under each system.
Here's the calculation:
Under the Traditional System:
Applied MOH = Total Overhead Cost / Estimated Machine Hours
Step by step
Solved in 3 steps