force of 40 N acts on body of mass 5 Kg which is initially at rest. What is the amount of work done in the first 10 s? a) 16000 J b) -16000 J c) 400 J d) -400 J
Q: Explain about Work done by a force.
A: When a force acts on an object over a distance, it is said to have done work on the object. It is…
Q: The rate at which work is done is known as .
A:
Q: 1. A car starts at rest, and ends up with 1500 J of KE. How much Work was done on it?
A: As per our guidelines, we are supposed to answer only first one question in case of multiple…
Q: How much work is done by the force of gravity in moving a 10 kg block from an initial height of 2 m…
A: Given: Mass of block, m = 10 kg initial height, h1 = 2 m final height, h2 = 10 m Value Used:…
Q: 6. A 0.150 kg baseball is moving 20.0 m/s. A bat hits it, doing 15.0 J of Work on it. What is the…
A: work energy theorem Wnet=change in kinetic energyWnet=∆KEWnet=KEfinal-KEinitialWnet=…
Q: A person pushes a wheelbarrow with a horizontal force of 50 N on levele ground over a distance of…
A: Drawing Free body diagram of the wheelbarrow We know that workdone W=F×D×cos(θ)…
Q: In the figure shown, if the mass (m=6 Kg) is moving with constant speed and traveled a distance…
A: In the given question, we have to find the work done by the frictional force in moving a distance of…
Q: Which statement about work is NOT true? OA. Work cannot be negative. B. Work is a scalar. OC. The…
A:
Q: Is work done whenever an object moves through a distance? Explain.
A: SOlution: To explain, if the work done whenever an object moves through a distance
Q: When the force is opposite the displacement of the object where it is acting, the force is doing A.…
A: Solution-: Since force is opposite the displacement of object then angle between force and…
Q: done
A:
Q: Physics A 1.65 kg book is sliding along a rough horizontal surface. At point A it is moving at 3.22…
A: Because the velocity decreased, work was done to slow down the book. the work is equal to slow down…
Q: QUESTION 4 The work done by any force can be calculated by using the formula W = F s cos(e) where…
A: The work by any force can be calculated by using the formula is W=Fscosθ Here F is the applied…
Q: A cheetah can accelerate from rest to 6.4 m/s (about 16 m/h) in 1.2 seconds. How much average power…
A:
Q: A car slams on its brakes and slows down. The work done by the brakes on the car must be a)…
A: Let the mass of car = m Let the initial velocity = u Let the final velocity = v It is given that…
Q: A 2.00-kg (20.0-N) stone is dropped from a height of 5.0 m, and strikes the ground with a velocity…
A: Given data: Mass (m) = 2.00 kg Weight (mg) = 20.0 N Height (h) = 5.0 m Initial velocity (v0) = 0 m/s…
Q: A 1900 lb. race car accelerates from rest to 275 mph in a quarter mile race. Determine how much work…
A: Given that, the weight of the car is w=1900lb the initial velocity of the car is u=0mph And the…
Q: A 1000 kg car moves with a speed of 20 m/s. Suddenly the driver slows to 7 m/s, what is the work…
A: The mass of the car, m is 1000 kg. The initial speed of the car, u is 20 m/s. The final speed of the…
Q: A 1400-N crate rests on the floor. a.) How much work is required to move it at constant speed 5.0 m…
A: Given Weight of the crate is Fg=1400 N Displacement of the crate is d=5.0 m Frictional force is…
Q: An object weighing 20 kg is raised through a height of 2 m. What will be the work done by the force…
A: mass = 2 kg height = 2m if the value of g = 10 m/s2
Q: A 1400 kg car accelerates from 5 m/s to 10 m/s. The net work done by the car is VI V2 500 kJ 200 kJ…
A: Given: The mass (m) of the car is 1400 Kg. The initial velocity (u) of the car is 5 m/s. The final…
Q: A force of 5 N acts on an initially stationary object of mass 15 kg. Calculate the work (J) done by…
A:
Q: 1. Draw a situation where a force is doing zero work. Explain why the force is doing no work,…
A: To explain a situation where work done by a force is zero.
Q: Give an example when the work done by a force is 1. Positive 2. Negative 3. Zero What is the effect…
A: Expression for the work done by a force is W=Fdcosθ The work done is positive when the displacement…
Q: An elevator is lifted by its cables at a constant speed. Is the total work done on the elevator…
A: If the elevator lifted by cables on the elevator two forces are acting 1) gravitational force…
Q: Calculate the work done from x=0.0 to x = 7.0 m by the one-dimensional force depicted in the…
A: Note:- The area under the force-displacement graph gives the work done.Given- the graph of one…
Q: 5. The diagram below shows points A, B, and C at or near Earth's surface. As a mass is moved from A…
A:
Q: What is the work done by the normal force FN ? A. F,dcos(30) B. F dcos(45) C. F dcos(60) D.…
A: Let FN denotes the work done by the normal force and d denotes the displacement of the block along…
Q: The work done in pushing a TV set a distance of 2 m with an average force of 55 N is _________ . In…
A:
Q: A block is moving with 52.0 J of KE. A 12.0 N force pulls the block straight back, against the…
A: Given data: Initial Kinetic Energy (KEi) = 52.0 J Force (F) = 12.0 N, straight backward Displacement…
Q: In the figure shown, if the mass (m36 Kg) is moving with constant speed and traveled a distance d314…
A: mass (m)= 6 kg distance covered (d) = 14 m speed = constant F = 15 N θ = 53o
Q: A block is at rest. A 40.0 N force directed 38.0° above horizontal pulls the block 8.00 m across…
A: Given data: Initial velocity (v0) = 0 m/s Force (F) = 40.0 N Angle (θ) = 38.0° Displacement (d) =…
Q: An 16-N block slides down an incline. It has an initial speed of 7 m/s. The work done by the…
A:
Q: Find the work done in joules by gravity as an object of the mass m-12 kg is raised up at constant…
A:
Q: If the force and displacement are in the same direction
A:
Q: How much work was done if an objects kinetic energy changes from 35 J to 15 J? A) -20 J B) 20 J C)…
A: Given, Initial KE =35J Final KE=15 J
Q: 1.90 kg book is sliding along a rough horizontal surface. At point A it is moving at 3.24 m/s, and…
A:
Q: In the figure shown, if the mass (m-6 Kg) is moving with constant speed and traveled a distance…
A:
Q: ind the work done in joules by gravity as an object of the mass m=15 kg is raised up at constant…
A: Mass (M)= 15kg Value of g=10m/S2 Height change from 35 to 69
Q: In the figure shown, if the mass (m=6 Kg) is moving with constant speed and traveled a distance…
A:
Q: shes it 10 meters and water fountain, what
A: Work is the product of Force and the displacement of the body in the direction of the force. When…
Q: A man claiming a mountain carrying a bag with mass 7.5 kg, after 30 min he reach 8.2 m height from…
A: Given data *The mass of the bag is m = 7.5 kg *The given time is t = 30 min *The height from the…
Q: Question 9 What does it mean when an object has positive work done on it by a force? Energy is…
A: In physics, work is defined as the amount of energy transferred to or from an object by a force…
Q: 7. A body of mass 40 Kg covers a distance of 50 m in 5s starting from rest under the influence of a…
A: Given data, Mass of the body m = 40 kg Distance s= 50 m Time t = 5 sec Starting from rest u = 0 m/s…
Q: An object is displaced by 0.5m against a force of friction at 2N. What is the work done on the…
A: Given Displacement of the object is d=0.5 m Force of friction on the object is f=2 N We have to…
force of 40 N acts on body of mass 5 Kg which is initially at rest. What is the amount of work done in the first 10 s?
a) 16000 J
b) -16000 J
c) 400 J
d) -400 J
Trending now
This is a popular solution!
Step by step
Solved in 3 steps