For the activity on node shown below, find the critical path and the expected duration of the project. [Note: P, x = Activity, duration in weeks] A.2 B.3 G₁2 C, 1 D.3 4 A H. 5 F.3 E.4 I, 3
For the activity on node shown below, find the critical path and the expected duration of the project. [Note: P, x = Activity, duration in weeks] A.2 B.3 G₁2 C, 1 D.3 4 A H. 5 F.3 E.4 I, 3
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
100%
How do you draw the nose network for this? Which activity goes in what circle? I’m confused by this orientation. I’ve attached an example of a node network I am used to seeing.
![For the activity on node shown below, find the critical path and the expected duration of the project. [Note: P, x = Activity, duration in weeks]
**Diagram Explanation:**
The diagram is a network flow chart depicting various activities and their corresponding durations in weeks. Each activity is represented by a directional arrow with its name and duration marked on the arrow. The network consists of nodes connected by activities:
1. **A, 2**: Starts at the initial node and leads to the next node.
2. **B, 3**: Connects two nodes.
3. **C, 1**: Connects from the second node to another node.
4. **D, 3**: Connects from the second node to another node.
5. **E, 4**: Connects from a node impacted by both C and D.
6. **F, 3**: Proceeds from a shared node.
7. **G, 2**: Starts from a shared node with other activities.
8. **H, 5**: Begins from a shared node with other activities.
9. **I, 3**: Concludes the network, leading to the final node.
To find the critical path, identify the longest duration path through this network, considering each activity and its duration in weeks.](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2Fce303429-f349-4313-b1b6-39c40e965b05%2F406ca437-5952-4f4d-be55-24afc2805491%2Fv6l5ehq_processed.jpeg&w=3840&q=75)
Transcribed Image Text:For the activity on node shown below, find the critical path and the expected duration of the project. [Note: P, x = Activity, duration in weeks]
**Diagram Explanation:**
The diagram is a network flow chart depicting various activities and their corresponding durations in weeks. Each activity is represented by a directional arrow with its name and duration marked on the arrow. The network consists of nodes connected by activities:
1. **A, 2**: Starts at the initial node and leads to the next node.
2. **B, 3**: Connects two nodes.
3. **C, 1**: Connects from the second node to another node.
4. **D, 3**: Connects from the second node to another node.
5. **E, 4**: Connects from a node impacted by both C and D.
6. **F, 3**: Proceeds from a shared node.
7. **G, 2**: Starts from a shared node with other activities.
8. **H, 5**: Begins from a shared node with other activities.
9. **I, 3**: Concludes the network, leading to the final node.
To find the critical path, identify the longest duration path through this network, considering each activity and its duration in weeks.

Transcribed Image Text:The image is a directed graph, representing a network of nodes and weighted edges. Here is a detailed description:
- Nodes labeled as: A, B, C, D, E, F
- Directed edges with weights are as follows:
- A to B with a weight of 3
- A to C with a weight of 4
- B to D with a weight of 5
- C to E with a weight of 4
- D to F with a weight of 6
- E to F with a weight of 7
Each node is connected by arrows indicating the direction of traversal, with numbers beside the arrows representing the weight or cost of traversing that particular edge. This structure might be used to represent routes, networks, or pathways in various educational contexts, such as studying algorithms, network design, or optimization problems.
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps with 2 images

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning