Factory Overhead Cost Variances Port Norris Textiles Corporation began September with a budget for 140,000 hours of production in the Weaving Department. The department has a full capacity of 150,000 hours under normal business conditions. The budgeted overhead at the planned volumes at the beginning of September was as follows: Variable overhead Fixed overhead I Total The actual factory overhead was $1,280,000 for September. The actual fixed factory overhead was as budgeted. During September, the Weaving Department had standard hours at actual production volume of 141,300 hours. $525,000 720,000 $1,245,000 Determine the variable factory overhead controllable variance and the fixed factory overhead volume variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Round your interim computations to the nearest cent, if required. a. Variable factory overhead controllable variance: b. Fixed factory overhead volume variance: $
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
Please do not give solution in image format thanku
Trending now
This is a popular solution!
Step by step
Solved in 3 steps