Explain the key constraints evident from the requirements. • Explain who is the sponsor, and the key stakeholders. • Explain which por�ons of your project can be completed itera�vely.
we will consider a case whereby you need to or would like to expand your home to
accommodate your growing family. Please construct a simple project plan that includes itera�ons, and
other elements of Agile covered in class. Your plan could be completely Agile/Itera�ve or could be a
hybrid of waterfall and Agile. Your plan should:
• Be no more than 4 standard-size, single-spaced pages long. You should use point-form, charts,
and tables to convey your informa�on concisely and clearly.
• Consider the star�ng requirements listed below.
• Explain the key constraints evident from the requirements.
• Explain who is the sponsor, and the key stakeholders.
• Explain which por�ons of your project can be completed itera�vely.
• Explain the number of itera�ons and the dura�on of each itera�on.
• Explain the ac�vi�es and tasks that need to take place during each itera�on, and/or the waterfall
stages if you are using a hybrid approach.
• Explain the poten�al decision points, and their loca�on in the project cycle.
• Provide dates for the start and end of each stage of the project.
• List and explain the possible dependencies, and their poten�al impact on the course of the
project.
• List any assump�ons you had to make when formula�ng the plan.
• Discuss how the introduc�on of itera�ons affected the dura�on and cost of the project
compared to Assignment 1, and how the quality of the finished extension is likely to be affected.
• Discuss why you chose to use either completely itera�ve, or hybrid itera�ve/waterfall approach.
• Must be submited via Blackboard assignment as a PDF document.
Please review the associate rubric in Blackboard before star�ng the assignment.
Star�ng Requirements
• The house extension should have 3 addi�onal bedrooms and 1 addi�onal bathroom.
• The architecture of the extension must be esthe�cally appealing and must not clash with the
current architecture of the house.
• The extension must connect with the exis�ng house, and the footprint must fit into the property
lines as required by the city bylaws.
• At least one of the bedrooms and the bathroom must be ready to move into by August 2024.
• The total budget for the extension is $200,000 CDN
![](/static/compass_v2/shared-icons/check-mark.png)
Step by step
Solved in 5 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
![Database System Concepts](https://www.bartleby.com/isbn_cover_images/9780078022159/9780078022159_smallCoverImage.jpg)
![Starting Out with Python (4th Edition)](https://www.bartleby.com/isbn_cover_images/9780134444321/9780134444321_smallCoverImage.gif)
![Digital Fundamentals (11th Edition)](https://www.bartleby.com/isbn_cover_images/9780132737968/9780132737968_smallCoverImage.gif)
![Database System Concepts](https://www.bartleby.com/isbn_cover_images/9780078022159/9780078022159_smallCoverImage.jpg)
![Starting Out with Python (4th Edition)](https://www.bartleby.com/isbn_cover_images/9780134444321/9780134444321_smallCoverImage.gif)
![Digital Fundamentals (11th Edition)](https://www.bartleby.com/isbn_cover_images/9780132737968/9780132737968_smallCoverImage.gif)
![C How to Program (8th Edition)](https://www.bartleby.com/isbn_cover_images/9780133976892/9780133976892_smallCoverImage.gif)
![Database Systems: Design, Implementation, & Manag…](https://www.bartleby.com/isbn_cover_images/9781337627900/9781337627900_smallCoverImage.gif)
![Programmable Logic Controllers](https://www.bartleby.com/isbn_cover_images/9780073373843/9780073373843_smallCoverImage.gif)