Example 4 A decision has to be made on whether touse 3 in. or 4 in. ID tubing for a well with the following conditions: Steady state inflow Solution; Initial pressure PI Bubble point pressure Depth (TVD) Required THP GOR 2,500 psi 2.0 STB/psi 1,200 psi 5,000 ft 300 psi 200 SCF/bbl (i) Calculate the flow capacity of the well for 4 in. and 3 in. ID use the attached gradient curves (ii) Comment on the general sizing of the available tubing strings. 1. Plot the IPR BHP: = 2500 psi IPR must pass through: Q-2,000 stb/d and Pf Plot P versus Q wf 2. Construct TPR curves 1,500 psi Tubing Size (inch) Rate THP (BOPD) (psi) Actual depth(fl) Depth TotalEquivalent Pwt Equivalent depth (It) (psi) to THPCftl 4 1000 300 5000 3346 8346 1720 2000 300 5000 2600 7600 1630 3000 300 5000 2800 7800 1723 3 1000 300 5000 2964 7964 1738 2000 300 5000 2400 7400 1770 3000 300 5000 1960 6960 1815

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Example 4
A decision has to be made on whether touse 3 in. or 4 in. ID tubing for a well with the
following conditions: Steady state inflow
Solution;
Initial
pressure PI
Bubble point pressure
Depth (TVD)
Required THP
GOR
2,500 psi
2.0 STB/psi
1,200 psi
5,000 ft
300 psi
200 SCF/bbl
(i) Calculate the flow capacity of the well for 4 in. and 3 in. ID use the
attached gradient curves
(ii) Comment on the general sizing of the available tubing strings.
Transcribed Image Text:Example 4 A decision has to be made on whether touse 3 in. or 4 in. ID tubing for a well with the following conditions: Steady state inflow Solution; Initial pressure PI Bubble point pressure Depth (TVD) Required THP GOR 2,500 psi 2.0 STB/psi 1,200 psi 5,000 ft 300 psi 200 SCF/bbl (i) Calculate the flow capacity of the well for 4 in. and 3 in. ID use the attached gradient curves (ii) Comment on the general sizing of the available tubing strings.
1. Plot the IPR
BHP:
= 2500 psi
IPR must pass through: Q-2,000 stb/d and Pf
Plot P versus Q
wf
2. Construct TPR curves
1,500 psi
Tubing Size
(inch)
Rate
THP
(BOPD)
(psi)
Actual
depth(fl)
Depth
TotalEquivalent
Pwt
Equivalent
depth (It)
(psi)
to THPCftl
4
1000
300
5000
3346
8346
1720
2000
300
5000
2600
7600
1630
3000
300
5000
2800
7800
1723
3
1000
300
5000
2964
7964
1738
2000
300
5000
2400
7400
1770
3000
300
5000
1960
6960
1815
Transcribed Image Text:1. Plot the IPR BHP: = 2500 psi IPR must pass through: Q-2,000 stb/d and Pf Plot P versus Q wf 2. Construct TPR curves 1,500 psi Tubing Size (inch) Rate THP (BOPD) (psi) Actual depth(fl) Depth TotalEquivalent Pwt Equivalent depth (It) (psi) to THPCftl 4 1000 300 5000 3346 8346 1720 2000 300 5000 2600 7600 1630 3000 300 5000 2800 7800 1723 3 1000 300 5000 2964 7964 1738 2000 300 5000 2400 7400 1770 3000 300 5000 1960 6960 1815
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning