Estimate the Slab reinforcement for the given figure below. All the straight bottom bars are 10mm@400mm c/c. All offset bars 12mm@400mm c/c, All Additional Top bars 12mm@400mm c/c. The slab thickness is 150mm. Assume cover is 25mm & wall thickness is 200mm. Note: 1-Standard bar hook-(12db+4db) with bend. Answer should be made such as table below from bar No.1 to bar No.8 Bar No. Length (m) Weight(Kg) -4.70m- 2 O opening 400mm (4 3.70m (8 Determine quantity of Steel in Kg for the Circular Sky-light in the figure above. Determine quantity of items below for given roof Figure above Concreter rate (1:1.5:3). y sand= 1835 kg/m³, y gravel = 2200 kg/m³ Item Unit Quantity Cement m3 Sand ton Gravel m3

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Estimate the Slab reinforcement for the given figure below. All the straight bottom bars are
10mm@400mm c/c. All offset bars 12mm@400mm c/c, All Additional Top bars 12mm@400mm
c/c. The slab thickness is 150mm. Assume cover is 25mm & wall thickness is 200mm.
Note: 1-Standard bar hook-(12db+4db) with bend.
Answer should be made such as table below from bar No.1 to bar No.8
Bar No. Length (m) Weight(Kg)
-4.70m-
2
opening
(7)
(4)
3.70m
400mm
8
6
Determine quantity of Steel in Kg for the Circular Sky-light in the figure above.
Determine quantity of items below for given roof Figure above Concreter rate (1:1.5:3).
y sand= 1835 kg/m³, y gravel = 2200 kg/m³
Item
Unit
Quantity
Cement m3
Sand
ton
Gravel
m3
Transcribed Image Text:Estimate the Slab reinforcement for the given figure below. All the straight bottom bars are 10mm@400mm c/c. All offset bars 12mm@400mm c/c, All Additional Top bars 12mm@400mm c/c. The slab thickness is 150mm. Assume cover is 25mm & wall thickness is 200mm. Note: 1-Standard bar hook-(12db+4db) with bend. Answer should be made such as table below from bar No.1 to bar No.8 Bar No. Length (m) Weight(Kg) -4.70m- 2 opening (7) (4) 3.70m 400mm 8 6 Determine quantity of Steel in Kg for the Circular Sky-light in the figure above. Determine quantity of items below for given roof Figure above Concreter rate (1:1.5:3). y sand= 1835 kg/m³, y gravel = 2200 kg/m³ Item Unit Quantity Cement m3 Sand ton Gravel m3
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Bars
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning