Electric power is to be generated by installing a hydraulic turbine-generator at a site 70 m below the free sur- face of a large water reservoir that can supply water at a rate of 3000 kg/s steadily. If the mechanical power output of the turbine is 800 kW and the electric power generation is 750 kW, determine the turbine efficiency and the combined tur- bine-generator efficiency of this plant. Friction in pipes = 8% of available potential energy. Answers: a) 38.83% b)36.41%

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question

Please verify my answer 

Given:
h = 70m
mass flow rate (@mass) = 3000 k
P
= 800 kW
P₂ = 750 kw
Solution
9130
Gamb
Turbine
√P₂
V2=0
70m
Find:
anturbine efficiency &
b) combined efficiencing.
Water Power pg Qh
1000981
= 2060100
Turbire Efficiency=
3000
шооку
m
Output,
Input
= 38.83%
Generator Efficiency output
input
Combined Efficiency=
x 70m
=
310
800 x10
2060106
750
800
= 0.9375
75000
20,01kW = 36.417.1
Transcribed Image Text:Given: h = 70m mass flow rate (@mass) = 3000 k P = 800 kW P₂ = 750 kw Solution 9130 Gamb Turbine √P₂ V2=0 70m Find: anturbine efficiency & b) combined efficiencing. Water Power pg Qh 1000981 = 2060100 Turbire Efficiency= 3000 шооку m Output, Input = 38.83% Generator Efficiency output input Combined Efficiency= x 70m = 310 800 x10 2060106 750 800 = 0.9375 75000 20,01kW = 36.417.1
1.
Electric power is to be generated by installing a
hydraulic turbine-generator at a site 70 m below the free sur-
face of a large water reservoir that can supply water at a rate
of 3000 kg/s steadily. If the mechanical power output of the
turbine is 800 kW and the electric power generation is 750
kW, determine the turbine efficiency and the combined tur-
bine-generator efficiency of this plant.
Friction in pipes = 8% of available potential energy.
Answers: a) 38.83%
b)36.41%
Transcribed Image Text:1. Electric power is to be generated by installing a hydraulic turbine-generator at a site 70 m below the free sur- face of a large water reservoir that can supply water at a rate of 3000 kg/s steadily. If the mechanical power output of the turbine is 800 kW and the electric power generation is 750 kW, determine the turbine efficiency and the combined tur- bine-generator efficiency of this plant. Friction in pipes = 8% of available potential energy. Answers: a) 38.83% b)36.41%
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Applied Fluid Mechanics
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY