Eight bulbs are connected in parallel to a 220V source by two long leads of total resistance 1.2.2. If 170 mA flowd theough each bulb, what fraction of the total is wasted in the leads?

Question
Sir my dear sir hero Hand written solution is not allowed.
Eight bulbs are connected in parallel to a 220V source
by two long leads of total resistance 1.202. If 170 mA
flowd theough each bulb, what fraction of the total is
wasted in the leads?
Transcribed Image Text:Eight bulbs are connected in parallel to a 220V source by two long leads of total resistance 1.202. If 170 mA flowd theough each bulb, what fraction of the total is wasted in the leads?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 7 images

Blurred answer