During the construction of a highway bridge, the average per- manent load on the clay layer is expected to increase by about 115 kN/m². The aver- age effective overburden pressure at the middle of the clay layer is 210 kN/m?. Here, H. = 6 m, C. = 0.28, e, = 0.9, and c, = 0.36 m/mo. The clay is normally consoli- dated. Determine (a) The total primary consolidation settlement of the bridge without precompression (b) The surcharge, Aơin, needed to eliminate the entire primary consolidation settlement in nine months by precompression with the addition of some sand drains. Assume that r = 0.1 m, d. = 3 m, c, = cr: and the surcharge is applied instantaneously. Also assume that this is a no-smear case.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Question attached

During the construction of a highway bridge, the average per-
manent load on the clay layer is expected to increase by about 115 kN/m². The aver-
age effective overburden pressure at the middle of the clay layer is 210 kN/m?. Here,
H. = 6 m, C. = 0.28, e, = 0.9, and c, = 0.36 m/mo. The clay is normally consoli-
dated. Determine
(a) The total primary consolidation settlement of the bridge without precompression
(b) The surcharge, Aơin, needed to eliminate the entire primary consolidation
settlement in nine months by precompression
with the addition of some sand drains. Assume that r = 0.1 m,
d. = 3 m, c, = cr: and the surcharge is applied instantaneously.
Also
assume that this is a no-smear case.
Transcribed Image Text:During the construction of a highway bridge, the average per- manent load on the clay layer is expected to increase by about 115 kN/m². The aver- age effective overburden pressure at the middle of the clay layer is 210 kN/m?. Here, H. = 6 m, C. = 0.28, e, = 0.9, and c, = 0.36 m/mo. The clay is normally consoli- dated. Determine (a) The total primary consolidation settlement of the bridge without precompression (b) The surcharge, Aơin, needed to eliminate the entire primary consolidation settlement in nine months by precompression with the addition of some sand drains. Assume that r = 0.1 m, d. = 3 m, c, = cr: and the surcharge is applied instantaneously. Also assume that this is a no-smear case.
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Stresses in saturated soil without seepage
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning