During a finishing operation the bed of an industrial planer moves alternately 30 in. to the right and 30 in, to the left. The velocity of the bed is limited to a maximum value of 6 in./s to the right and 12 in./s to the left; the acceleration is successively equal to 6 in./s² to the right, zero, 6 in./s² to the left, zero, etc. Determine the time required for the bed to complete a full cycle, and draw the t-t and x-t curves.

icon
Related questions
Question
During a finishing operation the bed of an industrial planer
moves alternately 30 in. to the right and 30 in, to the left. The
velocity of the bed is limited to a maximum value of 6 in./s to the
right and 12 in./s to the left; the acceleration is successively equal
to 6 in./s² to the right, zero, 6 in./s² to the left, zero, etc. Determine
the time required for the bed to complete a full cycle, and draw
the t-t and x-t curves.
Transcribed Image Text:During a finishing operation the bed of an industrial planer moves alternately 30 in. to the right and 30 in, to the left. The velocity of the bed is limited to a maximum value of 6 in./s to the right and 12 in./s to the left; the acceleration is successively equal to 6 in./s² to the right, zero, 6 in./s² to the left, zero, etc. Determine the time required for the bed to complete a full cycle, and draw the t-t and x-t curves.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 6 steps with 75 images