Direct materials $10 Direct manufacturing labor 2 Manufacturing overhead Total manufacturing cost 14 $26
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Opportunity costs. (H. Schaefer, adapted) The Wild Orchid Corporation is working at full production
capacity producing 13,000 units of a unique product, Everlast.
Manufacturing overhead cost per unit is based on variable cost per unit of $8 and fixed costs of $78,000 (at full capacity of 13,000 units). Marketing cost per unit, all variable, is $4, and the selling price is $52. A customer, the Apex Company, has asked Wild Orchid to produce 3,500 units of Stronglast, a modification of Everlast. Stronglast would require the same manufacturing processes as Everlast. Apex has offered to pay Wild Orchid $40 for a unit of Stronglast and share half of the marketing cost per unit.
- What is the opportunity cost to Wild Orchid of producing the 3,500 units of Stronglast? (Assume that no overtime is worked.)
- The Chesapeake Corporation has offered to produce 3,500 units of Everlast for Wild Orchid so that Wild Orchid may accept the Apex offer. That is, if Wild Orchid accepts the Chesapeake offer, Wild Orchid would manufacture 9,500 units of Everlast and 3,500 units of Stronglast and purchase 3,500 units of Everlast from Chesapeake. Chesapeake would charge Wild Orchid $36 per unit to manufacture Everlast. On the basis of financial considerations alone, should Wild Orchid accept the Chesapeake offer? Show your calculations.
- Suppose Wild Orchid had been working at less than full capacity, producing 9,500 units of Everlast, at the time the Apex offer was made. Calculate the minimum price Wild Orchid should accept for Stronglast under these conditions. (Ignore the previous $40 selling price.)
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 3 images