Develop a linear program that Photon Technologies can use to determine how many units of each battery pack to produce at each plant t minimize the total production and shipping cost associated with the new contract. If the constraint is one, enter "1". If the amount is zer enter "0". Let P1 = number of PT-100 battery packs produced at the Philippines plant P2 = number of PT-200 battery packs produced at the Philippines plant P3 = number of PT-300 battery packs produced at the Philippines plant M1 = number of PT-100 battery packs produced at the Mexico plant M2 = number of PT-200 battery packs produced at the Mexico plant M3 = number of PT-300 battery packs produced at the Mexico plant Min P1 + P2 + P3 + M1 + M2 + M3 s.t. P1 + P2 + P3 + M1 + M2 + M3 = Production PT- P1 + P2 + P3 + M1 + M2 + M3 = Production PT- P1 + P2 + P3 + M1 + M2 + M3 = Production PT- P1 + P2 + P3 + M1 + M2 + M3 S Capacity Phi P & 200 P1 + P2 + P3 + M1 + M2 + M3 s Capacity Mex 100 & 200 P1 + P2 + Р3 + M1 + M2 + M3 s Capacity Phi P P1 + P2 + P3 + M1 + M2 + M3 S Capacity Mex 300 P1 P2 p3 M1 M2 M3 >0

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
(b) Solve the linear program developed in part (a), to determine the optimal production plan. If the amount is zero, enter "0".
 
  Qty Produced
  Phillipines Mexico
PT-100    
PT-200    
PT-300    
  Total Cost = __________$
(c) Use sensitivity analysis to determine how much the production and/or shipping cost per unit would have to change to produce additional units of the PT-100 in the Philippines plant.
  If required, round your answer to two decimal digits.
  At least $ _________/ unit.
(d) Use sensitivity analysis to determine how much the production and/or shipping cost per unit would have to change to produce additional units of the PT-200 in the Mexico plant.
  If required, round your answer to two decimal digits.
  At least $ _______/ unit.
Photon Technologies, Inc., a manufacturer of batteries for mobile phones, signed a contract with a large electronics manufacturer to produce three models of lithium-ion battery packs for a new line of phones. The contract calls for the following production quantities:

- **PT-100:** 200,000 units
- **PT-200:** 100,000 units
- **PT-300:** 150,000 units

Photon Technologies can manufacture the battery packs at manufacturing plants located in the Philippines and Mexico. The unit cost of the battery packs differs at the two plants due to differences in production equipment and wage rates. The unit costs for each battery pack at each manufacturing plant are listed below:

| Product | Philippines | Mexico |
|---|---|---|
| PT-100 | $0.95 | $0.98 |
| PT-200 | $0.98 | $1.06 |
| PT-300 | $1.34 | $1.15 |

The PT-100 and PT-200 battery packs are produced using similar production equipment available at both plants. However, each plant has a limited capacity for the total number of PT-100 and PT-200 battery packs produced. The combined PT-100 and PT-200 production capacities are 175,000 units at the Philippines plant and 160,000 units at the Mexico plant. The PT-300 production capacities are 75,000 units at the Philippines plant and 100,000 units at the Mexico plant. The cost of shipping from the Philippines plant is $0.15 per unit, and from the Mexico plant is $0.12 per unit.
Transcribed Image Text:Photon Technologies, Inc., a manufacturer of batteries for mobile phones, signed a contract with a large electronics manufacturer to produce three models of lithium-ion battery packs for a new line of phones. The contract calls for the following production quantities: - **PT-100:** 200,000 units - **PT-200:** 100,000 units - **PT-300:** 150,000 units Photon Technologies can manufacture the battery packs at manufacturing plants located in the Philippines and Mexico. The unit cost of the battery packs differs at the two plants due to differences in production equipment and wage rates. The unit costs for each battery pack at each manufacturing plant are listed below: | Product | Philippines | Mexico | |---|---|---| | PT-100 | $0.95 | $0.98 | | PT-200 | $0.98 | $1.06 | | PT-300 | $1.34 | $1.15 | The PT-100 and PT-200 battery packs are produced using similar production equipment available at both plants. However, each plant has a limited capacity for the total number of PT-100 and PT-200 battery packs produced. The combined PT-100 and PT-200 production capacities are 175,000 units at the Philippines plant and 160,000 units at the Mexico plant. The PT-300 production capacities are 75,000 units at the Philippines plant and 100,000 units at the Mexico plant. The cost of shipping from the Philippines plant is $0.15 per unit, and from the Mexico plant is $0.12 per unit.
**Linear Programming for Battery Pack Production Optimization**

Photon Technologies needs to determine the optimal number of battery packs to produce at each plant to minimize production and shipping costs. To achieve this, a linear program model is being developed.

**Variables Definition:**

- **P1** = Number of PT-100 battery packs produced at the Philippines plant
- **P2** = Number of PT-200 battery packs produced at the Philippines plant
- **P3** = Number of PT-300 battery packs produced at the Philippines plant
- **M1** = Number of PT-100 battery packs produced at the Mexico plant
- **M2** = Number of PT-200 battery packs produced at the Mexico plant
- **M3** = Number of PT-300 battery packs produced at the Mexico plant

**Objective:**

- Minimize the total number of battery packs produced: P1 + P2 + P3 + M1 + M2 + M3

**Subject to Constraints:**

1. **Production Constraints:**
   - \( P1 + M1 =\) Production PT-100
   - \( P2 + M2 =\) Production PT-200
   - \( P3 + M3 =\) Production PT-300

2. **Capacity Constraints:**
   - \( P1 + P2 + M1 + M2 \leq\) Capacity for Philippines PT-100 & 200
   - \( P1 + P2 + M1 + M2 \leq\) Capacity for Mexico PT-100 & 200
   - \( P3 + M3 \leq\) Capacity for Philippines PT-300
   - \( P3 + M3 \leq\) Capacity for Mexico PT-300

3. **Non-negativity Constraints:**
   - \( P1, P2, P3, M1, M2, M3 \geq 0\)

This linear program will help Photon Technologies decide on the number of units to produce at each location while minimizing associated costs.
Transcribed Image Text:**Linear Programming for Battery Pack Production Optimization** Photon Technologies needs to determine the optimal number of battery packs to produce at each plant to minimize production and shipping costs. To achieve this, a linear program model is being developed. **Variables Definition:** - **P1** = Number of PT-100 battery packs produced at the Philippines plant - **P2** = Number of PT-200 battery packs produced at the Philippines plant - **P3** = Number of PT-300 battery packs produced at the Philippines plant - **M1** = Number of PT-100 battery packs produced at the Mexico plant - **M2** = Number of PT-200 battery packs produced at the Mexico plant - **M3** = Number of PT-300 battery packs produced at the Mexico plant **Objective:** - Minimize the total number of battery packs produced: P1 + P2 + P3 + M1 + M2 + M3 **Subject to Constraints:** 1. **Production Constraints:** - \( P1 + M1 =\) Production PT-100 - \( P2 + M2 =\) Production PT-200 - \( P3 + M3 =\) Production PT-300 2. **Capacity Constraints:** - \( P1 + P2 + M1 + M2 \leq\) Capacity for Philippines PT-100 & 200 - \( P1 + P2 + M1 + M2 \leq\) Capacity for Mexico PT-100 & 200 - \( P3 + M3 \leq\) Capacity for Philippines PT-300 - \( P3 + M3 \leq\) Capacity for Mexico PT-300 3. **Non-negativity Constraints:** - \( P1, P2, P3, M1, M2, M3 \geq 0\) This linear program will help Photon Technologies decide on the number of units to produce at each location while minimizing associated costs.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.