desi cubic yard of concrete to have a 0.43 water-cement ratio, 12 kg/m3 of dry gravel, 145 kg/m3 of water, and 4% air content The available gravel has a specific gravity of Ggravel = 2.60, moisture content of 2.3%, and absorption of 4.5%. The available sand has a specific gravity of Gsand = 2.40, a moisture content of 2.2%, and absorption of 1.7%. Air entrainer is to be included using the manufacturers specification of 6.3 mL/1% air/100 kg cement. For each cubi meter of concrete needed on the job, calculate the weight o cement, moist gravel, moist sand, and water that should be added to the batch. Summarize and total the mix design wh finished.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Mix design

You are working on a concrete mix design that requires each
cubic yard of concrete to have a 0.43 water-cement ratio, 1232
kg/m3 of dry gravel, 145 kg/m3 of water, and 4% air content.
The available gravel has a specific gravity of Ggravel = 2.60, a
moisture content of 2.3%, and absorption of 4.5%. The
available sand has a specific gravity of Gsand = 2.40, a
moisture content of 2.2%, and absorption of 1.7%. Air
entrainer is to be included using the manufacturers
specification of 6.3 mL/1% air/100 kg cement. For each cubic
meter of concrete needed on the job, calculate the weight of
cement, moist gravel, moist sand, and water that should be
added to the batch. Summarize and total the mix design when
finished.
Transcribed Image Text:You are working on a concrete mix design that requires each cubic yard of concrete to have a 0.43 water-cement ratio, 1232 kg/m3 of dry gravel, 145 kg/m3 of water, and 4% air content. The available gravel has a specific gravity of Ggravel = 2.60, a moisture content of 2.3%, and absorption of 4.5%. The available sand has a specific gravity of Gsand = 2.40, a moisture content of 2.2%, and absorption of 1.7%. Air entrainer is to be included using the manufacturers specification of 6.3 mL/1% air/100 kg cement. For each cubic meter of concrete needed on the job, calculate the weight of cement, moist gravel, moist sand, and water that should be added to the batch. Summarize and total the mix design when finished.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 5 steps with 12 images

Blurred answer
Knowledge Booster
Measuring concrete work
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning