desi cubic yard of concrete to have a 0.43 water-cement ratio, 12 kg/m3 of dry gravel, 145 kg/m3 of water, and 4% air content The available gravel has a specific gravity of Ggravel = 2.60, moisture content of 2.3%, and absorption of 4.5%. The available sand has a specific gravity of Gsand = 2.40, a moisture content of 2.2%, and absorption of 1.7%. Air entrainer is to be included using the manufacturers specification of 6.3 mL/1% air/100 kg cement. For each cubi meter of concrete needed on the job, calculate the weight o cement, moist gravel, moist sand, and water that should be added to the batch. Summarize and total the mix design wh finished.
desi cubic yard of concrete to have a 0.43 water-cement ratio, 12 kg/m3 of dry gravel, 145 kg/m3 of water, and 4% air content The available gravel has a specific gravity of Ggravel = 2.60, moisture content of 2.3%, and absorption of 4.5%. The available sand has a specific gravity of Gsand = 2.40, a moisture content of 2.2%, and absorption of 1.7%. Air entrainer is to be included using the manufacturers specification of 6.3 mL/1% air/100 kg cement. For each cubi meter of concrete needed on the job, calculate the weight o cement, moist gravel, moist sand, and water that should be added to the batch. Summarize and total the mix design wh finished.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
Mix design

Transcribed Image Text:You are working on a concrete mix design that requires each
cubic yard of concrete to have a 0.43 water-cement ratio, 1232
kg/m3 of dry gravel, 145 kg/m3 of water, and 4% air content.
The available gravel has a specific gravity of Ggravel = 2.60, a
moisture content of 2.3%, and absorption of 4.5%. The
available sand has a specific gravity of Gsand = 2.40, a
moisture content of 2.2%, and absorption of 1.7%. Air
entrainer is to be included using the manufacturers
specification of 6.3 mL/1% air/100 kg cement. For each cubic
meter of concrete needed on the job, calculate the weight of
cement, moist gravel, moist sand, and water that should be
added to the batch. Summarize and total the mix design when
finished.
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 5 steps with 12 images

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning