Department F had 4,000 units in Work in Process that were 40% completed at the beginning of the period at a cost of $12,900. Of the $12,900, $8,500 was for mat and $4,400 was for conversion costs. 14,000 units of direct materials were added during the period at a cost of $26,800. 15,000 units were completed during the pe and 3,000 units were 75% completed at the end of the period. All materials are added at the beginning of the process. Direct labor was $34,000 and factory overhea was $18,600. If the average cost method is used, the conversion cost per unit (to the nearest cent) would be a. $3.17 b. $3.80 c. $3.30 d. $5.18
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Dinesh Bhai
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 2 images