Crane Company accumulates the following data concerning a mixed cost, using miles as the activity level. Miles Driven Total Cost Miles Driven Total Cost January 7995 14180 March 8510 14909 February 7505 13502 April 8200 14495 a/ Compute the variable cost per mile using the high-low method. (Round answer to 2 decimal places) Variable cost per mile b/ Compute the fixed cost elements using the high-low method. Fixed costs
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Crane Company accumulates the following data concerning a mixed cost, using miles as the activity level.
|
Miles Driven |
Total Cost |
|
Miles Driven |
Total Cost |
January |
7995 |
14180 |
March |
8510 |
14909 |
February |
7505 |
13502 |
April |
8200 |
14495 |
a/ Compute the variable cost per mile using the high-low method. (Round answer to 2 decimal places)
Variable cost per mile
b/ Compute the fixed cost elements using the high-low method.
Fixed costs