Cookie-baking project: the recipe provides the complete statement of work, from which the work breakdown structure can be developed. The resources available for this project are two cooks and one oven with limited capacity; the raw materials are the ingredients to be used in preparing the cookie dough. As listed in following table, the activities take a total of 80 minutes of resource time. Because some activities can run parallel, the cooks should complete the project in less than 80 minutes. Following table displays some of the planning that will save time in the project. For example, once the oven is turned on, it heats itself, freeing the cooks to perform other activities. After the dough is mixed, both batches of cookies can be shaped; the shaping of the second batch does not have to wait until the first batch is complete. If both cooks are available, they can divide the dough in half and each cook can shape one batch in the same four-minute period. However, if the second cook is not available at this time, the project is not delayed because shaping of the second batch need not be completed until the first batch exits the oven. Description of Activity Duration (minutes) Immediate Predecessor(s) A. Preheat oven 15 minutes B. Assemble, measure ingredients 8 minutes C. Mix dough D. Shape first batch 2 minutes B 4 minutes C E. Bake first batch 12 minutes A, D F. Cool first batch 10 minutes E G. Shape second batch 4 minutes C H. Bake second batch 12 minutes E, G I. Cool second batch J. Store cookies Total time 10 minutes H 3 minutes F, I 80 minutes Imagine the start time is 8 am, use CPM (critical path method) to plan for this task.

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
Kindly give me a detailed response
Cookie-baking project: the recipe provides the complete statement of work, from
which the work breakdown structure can be developed. The resources available for
this project are two cooks and one oven with limited capacity; the raw materials are the
ingredients to be used in preparing the cookie dough. As listed in following table, the
activities take a total of 80 minutes of resource time. Because some activities can run
parallel, the cooks should complete the project in less than 80 minutes.
Following table displays some of the planning that will save time in the project. For
example, once the oven is turned on, it heats itself, freeing the cooks to perform other
activities. After the dough is mixed, both batches of cookies can be shaped; the
shaping of the second batch does not have to wait until the first batch is complete. If
both cooks are available, they can divide the dough in half and each cook can shape
one batch in the same four-minute period. However, if the second cook is not available
at this time, the project is not delayed because shaping of the second batch need not
be completed until the first batch exits the oven.
Description of Activity
Duration (minutes) Immediate Predecessor(s)
A. Preheat oven
15 minutes
B. Assemble, measure ingredients 8 minutes
C. Mix dough
D. Shape first batch
2 minutes
B
4 minutes
C
E. Bake first batch
12 minutes
A, D
F. Cool first batch
10 minutes
E
G. Shape second batch
4 minutes
C
H. Bake second batch
12 minutes
E, G
I. Cool second batch
J. Store cookies
Total time
10 minutes
H
3 minutes
F, I
80 minutes
Imagine the start time is 8 am, use CPM (critical path method) to plan for this task.
Transcribed Image Text:Cookie-baking project: the recipe provides the complete statement of work, from which the work breakdown structure can be developed. The resources available for this project are two cooks and one oven with limited capacity; the raw materials are the ingredients to be used in preparing the cookie dough. As listed in following table, the activities take a total of 80 minutes of resource time. Because some activities can run parallel, the cooks should complete the project in less than 80 minutes. Following table displays some of the planning that will save time in the project. For example, once the oven is turned on, it heats itself, freeing the cooks to perform other activities. After the dough is mixed, both batches of cookies can be shaped; the shaping of the second batch does not have to wait until the first batch is complete. If both cooks are available, they can divide the dough in half and each cook can shape one batch in the same four-minute period. However, if the second cook is not available at this time, the project is not delayed because shaping of the second batch need not be completed until the first batch exits the oven. Description of Activity Duration (minutes) Immediate Predecessor(s) A. Preheat oven 15 minutes B. Assemble, measure ingredients 8 minutes C. Mix dough D. Shape first batch 2 minutes B 4 minutes C E. Bake first batch 12 minutes A, D F. Cool first batch 10 minutes E G. Shape second batch 4 minutes C H. Bake second batch 12 minutes E, G I. Cool second batch J. Store cookies Total time 10 minutes H 3 minutes F, I 80 minutes Imagine the start time is 8 am, use CPM (critical path method) to plan for this task.
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,