Construct the network for the shown project and find the total project duration using the CPM Method. Duration Activity Pred. (Weeks) A 14.0 B 11.3 C A 21.2 DEFGH A 15.0 B 15.3 B 15.8 C, E 13.2 C, E, F 14.0 1 C, E, F 30.8 J D 11.2 K D 1.0 L G, J, H 9.2 M K 8.8 Start 0 10 2 Set-up Site 1 2 3 (1,1) 0 14 5 Proc. RFT 055 (0,0) 2 20 4 Exc. Left 5 27 (3,3) 2 40 5 Exc. Centre 6 39 (4,4) 2 30 4 Exc. Right 325 (1,1) 5 50 7 Found. Left 7 29 (2,2) Critical Path Method 7 80 11 Abut. Left 9 4 13 (2,2) 5 70 7 Found. Cent. 7 100 13 9 2 11 (4,4) 11 140 21 Fill Left 13 10 23 21 160 24 Road Left 23 3 26 (2,2) (2,2) Pier 11 6 17 13 110 14 Left Beam 17 1 18 (4,4) 14 120 15 (4,4) 5 60 7 Found. Right 527 7 90 11 → Abut. Right Right Beam 74 11 17 1 18 (0,0) (3,3) (0,0) 14 155 22 Deck Slab 18 8 26 (4,4) 26 180 28 Surfacing 26 2 28 (0,0) 22 190 24 Handrail 26 2 28 (4,4) 28 200 29 Clear Site 28 1 29 (0,0) 0 16 10 Proc. Beams 7 10 17 (7,7) 11 150 23 Fill Right 11 12 23 (0,0) 23 170 26 Road Right 23 3 26 (0,0) ES Code EF Description LS Dur. LF (TF, TF)
Construct the network for the shown project and find the total project duration using the CPM Method. Duration Activity Pred. (Weeks) A 14.0 B 11.3 C A 21.2 DEFGH A 15.0 B 15.3 B 15.8 C, E 13.2 C, E, F 14.0 1 C, E, F 30.8 J D 11.2 K D 1.0 L G, J, H 9.2 M K 8.8 Start 0 10 2 Set-up Site 1 2 3 (1,1) 0 14 5 Proc. RFT 055 (0,0) 2 20 4 Exc. Left 5 27 (3,3) 2 40 5 Exc. Centre 6 39 (4,4) 2 30 4 Exc. Right 325 (1,1) 5 50 7 Found. Left 7 29 (2,2) Critical Path Method 7 80 11 Abut. Left 9 4 13 (2,2) 5 70 7 Found. Cent. 7 100 13 9 2 11 (4,4) 11 140 21 Fill Left 13 10 23 21 160 24 Road Left 23 3 26 (2,2) (2,2) Pier 11 6 17 13 110 14 Left Beam 17 1 18 (4,4) 14 120 15 (4,4) 5 60 7 Found. Right 527 7 90 11 → Abut. Right Right Beam 74 11 17 1 18 (0,0) (3,3) (0,0) 14 155 22 Deck Slab 18 8 26 (4,4) 26 180 28 Surfacing 26 2 28 (0,0) 22 190 24 Handrail 26 2 28 (4,4) 28 200 29 Clear Site 28 1 29 (0,0) 0 16 10 Proc. Beams 7 10 17 (7,7) 11 150 23 Fill Right 11 12 23 (0,0) 23 170 26 Road Right 23 3 26 (0,0) ES Code EF Description LS Dur. LF (TF, TF)
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
(Introduction to Construction Engineering and Management CVE 310).Construct the network for the shown project and find the total project duration using the CPM Method.(same to the example that shown in pictures)
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning